Please Wait ...
Processing
Alerts Alerts: View All Alerts View All Alerts
My511NY
Ridematch
My Location
 
 
 
 
My511NY Signup
 
Forgot your password?
 Save List  Display List  Clear List Set List Refresh Rate: 
Filter event list by:      
Event Type
Roadway
         
Type Location/Roadway Description County Region Last Updated Event Type FacilityName
constructionBronx-Whitestone BridgeeventMTA Bridges & Tunnels: bridge rehabilitation on Bronx-Whitestone Bridge northbound approaching Queens Side (New York) 3rd Avenue exit closed for two years from both Cross Island Parkway and Whitestone Expressway, Continuous Monday January 7th, 2013 10:00 AM thru Wednesday January 7th, 2015 11:59 PMQueensNew York City Area1/7/2013 9:58:12 AMConstructionBronx-Whitestone Bridge
constructionNY 7eventNYSDOT: road construction on NY 7 in both directions at Town of Princetown; Town of Duanesburg Line starting 7:00:00 AM, 4/22/2013 until further notice. Comment: This roadwork will take place on Birchwood Drive in the town of Duanesburg. Birchwood Drive will be closed at both ends of the bridge over I-88. All lanes on Rte 7 will remain open,SchenectadyCapital Region Albany Saratoga Area8/17/2013 12:16:49 PMConstructionNY 7
closure constructionSouth Tenth AvenueeventNYSDOT - Region 8: roadwork on South Tenth Avenue both directions between Stevens Avenue (Mount Vernon) and West First Street (Mount Vernon) , Continuous Monday January 3rd, 2011 12:00 AM thru Wednesday December 31st, 2014 11:59 PM all lanes closedWestchesterHudson Valley Catskill Area12/19/2013 7:18:01 AMClosure ConstructionSouth Tenth Avenue
constructionUS 11eventNYSDOT: road construction on US 11 from Clinton Street; NY 58; William Street; Start of NY 812 Overlap to Rowley Street; Gouverneur North Line starting 7:00 AM, 06/03/13 starting 7:00:00 AM, 6/3/2013 until further notice. Comment: Motorists should expect some minor delays. Traffic will be controlled with signs and flaggers.St. LawrenceAdirondack Watertown Plattsburgh Area5/28/2013 10:58:03 AMConstructionUS 11
constructionBelt System - Shore ParkwayeventNYSDOT - Region 11: longterm construction on Belt System - Shore Parkway both directions between Exit 11B - Flatbush Avenue; Ramp (New York) and Exit 14 - Pennsylvania Avenue (New York) All three westbound lanes will be shifted onto a new temporary bridge over Fresh Creek for approximately 30 months., Monday November 1st, 2010 thru Friday October 31st, 2014, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed, Sunday October 31st, 2010 thru Friday October 31st, 2014 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 01:00 AM, 1 lane closed, Monday November 1st, 2010 thru Friday October 31st, 2014, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closedKingsNew York City Area1/31/2014 10:58:00 AMConstructionBelt System - Shore Parkway
constructionColumbus AvenueeventNYSDOT - Region 11: longterm construction on Columbus Avenue between West 65th Street (Manhattan) and West 60th Street (Manhattan) to facilitate NYCDDC major capital water main installation., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 2 lanes openNew YorkNew York City Area5/31/2013 5:09:04 PMConstructionColumbus Avenue
constructionHudson StreeteventNYSDOT - Region 11: longterm construction on Hudson Street northbound between Worth Street (Manhattan) and North Moore Street (Manhattan) These Streets will be narrowed to two lanes of traffic to facilitate NYCDDC trunk watermain work., Continuous Monday March 4th, 2013 12:00 AM thru Saturday September 19th, 2015 11:59 PM 2 lanes openNew YorkNew York City Area5/31/2013 5:24:36 PMConstructionHudson Street
closure constructionGoulden AvenueeventNYSDOT - Region 11: construction on Goulden Avenue both directions between Sedgwick Avenue (Bronx) and 205th Street (Bronx) to facilitate NYCDEP water main project., Continuous Tuesday March 5th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 1 lane open, Continuous Thursday June 27th, 2013 12:00 AM thru Monday August 31st, 2015 11:59 PM all lanes closedBronxNew York City Area6/21/2013 4:52:05 PMClosure ConstructionGoulden Avenue
constructionWest 30th StreeteventNYSDOT - Region 11: longterm construction on West 30th Street eastbound between 11th Avenue (Manhattan) and 10th Avenue (Manhattan) to facilitate NYCDDC contractor's water main installation project. Additionally no left turns are permitted for truck and buses from eastbound 30th Street to northbound 10th Avenue. Motorists should follow posted detour., Continuous Wednesday August 7th, 2013 12:00 AM thru Tuesday June 30th, 2015 11:59 PM 1 lane openNew YorkNew York City Area8/7/2013 10:30:00 AMConstructionWest 30th Street
constructionWest 60th StreeteventNYSDOT - Region 11: construction on West 60th Street westbound between Columbus Avenue (New York) and Amsterdam Avenue NOTE: Effective August 16th through September 20th, 2013 this street will be one-way eastbound, with intermittent closures, to facilitate special event..To facilitate NYCDDC major capital water main installation, Continuous Wednesday August 7th, 2013 12:00 AM thru Sunday November 30th, 2014 11:59 PM 1 lane openNew YorkNew York City Area2/18/2014 2:38:48 PMConstructionWest 60th Street
closure constructionDock StreeteventNYSDOT - Region 8: roadwork on Dock Street both directions west of River Road (Hyde Park) , Continuous Tuesday December 4th, 2012 12:00 AM thru Wednesday December 31st, 2014 11:59 PM all lanes closedDutchessHudson Valley Catskill Area12/19/2013 7:01:56 AMClosure ConstructionDock Street
constructionNY 232eventNYSDOT: bridge construction on NY 232 at Junction NY 970K; I-81 SB (Exit 44) conn. to NY 232 starting 8:00:00 AM, 4/25/2013 until further notice.JeffersonAdirondack Watertown Plattsburgh Area7/17/2013 8:54:43 AMConstructionNY 232
constructionNY 11BeventNYSDOT: road construction on NY 11B from Town of Lawrence; Town of Dickinson Line; Saint Lawrence County - Franklin County Line to Doug Smith Road starting 7:00:00 AM, 6/26/2013 until further notice.FranklinAdirondack Watertown Plattsburgh Area7/19/2013 2:31:09 PMConstructionNY 11B
constructionNY 9LeventNYSDOT: paving operations, reduced to one lane on NY 9L in both directions from City of Glens Falls; Town of Queensbury Line to Town of Queensbury; Town of Lake George Line starting 8:42:00 PM, 8/6/2013 until further notice.WarrenAdirondack Watertown Plattsburgh Area8/6/2013 8:43:03 PMConstructionNY 9L
special eventBrooklyn Battery TunneleventMTA Bridges & Tunnels: operational activity at Brooklyn Battery Tunnel both directions Manhattan/Brooklyn Bound (Manhattan/Brooklyn) two way traffic in west tunnel, drive with caution, Monday September 2nd, 2013 thru Friday December 26th, 2014, Monday thru Friday, 06:00 AM thru 10:00 AMNew York/KingsNew York City Area1/31/2014 10:58:00 AMSpecial EventsBrooklyn Battery Tunnel
constructionNY 67eventNYSDOT: single line traffic alternating directions on NY 67 in both directions at Town of White Creek; Town of Hoosick Line due to bridge maintenance operations and due to temporary traffic lights starting 12:38:00 PM, 9/18/2013 until further notice. Comment: the Route 67 bridge over the Hoosick River, locally known as the Eagle Bridge, in the hamlet of Eagle Bridge, Town of Hoosick, Rensselaer County, has been reduced to one alternating lane of traffic.Traffic will be controlled by signals at both ends of the bridge and at nearby River Road and Old State Road, both on the east side of the bridge.RensselaerCapital Region Albany Saratoga Area9/20/2013 12:45:40 PMConstructionNY 67
constructionNY 22eventNYSDOT: bridge maintenance operations, reduced to one lane on NY 22 from Hamlet of Mooers to before Hamlet of Mooers starting 9:28:00 AM, 10/16/2013 until further notice. Comment: Bridge expansion joint repairs. State Bridge crew is utilizing portable traffic lights.ClintonAdirondack Watertown Plattsburgh Area10/16/2013 9:35:50 AMConstructionNY 22
constructionNY 214eventNYSDOT: single line traffic alternating directions, temporary traffic lights on NY 214 in both directions at Diamond Notch Road; Lanesville due to road construction starting 7:00:00 AM, 10/21/2013 until further notice. Comment: This work will be in the Village of HunterGreeneHudson Valley Catskill Area10/21/2013 2:36:35 PMConstructionNY 214
construction1st AvenueeventNYSDOT - Region 11: construction on 1st Avenue between East 57th Street (New York) and East 59th Street To facilitate NYCDDC water main installation., Continuous Friday October 25th, 2013 12:00 AM thru Thursday December 25th, 2014 11:59 PM 4 lanes openNew YorkNew York City Area10/25/2013 1:37:26 PMConstruction1st Avenue
constructionLake Ontario State ParkwayeventNYSDOT: closed for the season on Lake Ontario State Parkway from Point Breeze Road; NY 98 to START ROUTE Lake Ontario State Parkway starting 8:12:00 AM, 11/12/2013 until further notice. Comment: NY 18 has been posted as detour for the duration of the closure.OrleansNiagara Buffalo Area4/30/2014 2:54:39 AMConstructionLake Ontario State Parkway
closure constructionLake Ontario State ParkwayeventNYSDOT: closed for the season on Lake Ontario State Parkway from Point Breeze Road; NY 98 to START ROUTE Lake Ontario State Parkway starting 8:12:00 AM, 11/12/2013 until further notice. Comment: NY 18 has been posted as detour for the duration of the closure.OrleansNiagara Buffalo Area4/30/2014 2:54:39 AMClosure ConstructionLake Ontario State Parkway
closure constructionLake Ontario State ParkwayeventNYSDOT: closures on Lake Ontario State Parkway between Point Breeze Road; NY 98 (Carlton) and START ROUTE Lake Ontario State Parkway closed for the season. Comment: NY 18 has been posted at detour for the duration of the closure.OrleansNiagara Buffalo Area11/21/2013 12:00:00 AMClosure ConstructionLake Ontario State Parkway
constructionI-84eventNYSDOT - Region 8: roadwork on I-84 both directions at Exit 4 (I-84) - NY17 to Binghamton/NYC (Wallkill) , Friday October 24th, 2014 thru Sunday October 26th, 2014 Sunday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right shoulder closures, Monday October 27th, 2014 thru Sunday November 2nd, 2014, Sunday thru Saturday, 09:00 AM thru 03:00 PM, right shoulder closuresOrangeHudson Valley Catskill Area10/23/2014 6:12:23 AMConstructionI-84
closure constructionParkway RoadeventNYSDOT - Region 8: roadwork on Parkway Road both directions between Dewitt Avenue (Bronxville) and Midland Avenue (Bronxville) , Continuous Thursday January 2nd, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM all lanes closedWestchesterHudson Valley Catskill Area1/2/2014 7:14:06 AMClosure ConstructionParkway Road
constructionI-84eventNYSDOT - Region 8: roadwork on I-84 both directions at Exit 4 (I-84) - NY17 to Binghamton/NYC (Wallkill) , Friday October 24th, 2014 thru Sunday October 26th, 2014 Sunday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, various lane closures, Monday October 27th, 2014 thru Sunday November 2nd, 2014, Sunday thru Saturday, 09:00 AM thru 03:00 PM, various lane closuresOrangeHudson Valley Catskill Area10/23/2014 6:11:46 AMConstructionI-84
constructionNY 9AeventNYSDOT - Region 11: construction on NY 9A northbound between Albany Street (New York) and Liberty Street (New York) The northbound left turn will be restricted and the left turn will be permitted at the prior intersection of Albany Street., Continuous Tuesday February 18th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM left lane openNew YorkNew York City Area2/18/2014 12:41:27 PMConstructionNY 9A
construction7th AvenueeventNYSDOT - Region 11: construction on 7th Avenue between West 42nd Street (New York) and West 47th Street (New York) During these times one lane of traffic is maintained on crosstown streets. On nightly basis work in confined to the specific areas within the above limits of 7th Avenue., Tuesday February 18th, 2014 thru Tuesday December 30th, 2014 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 08:00 AM, 2 lanes open, Tuesday February 18th, 2014 thru Tuesday December 30th, 2014, Saturday/Sunday, 01:00 AM thru 12:01 PM, 1 lane openNew YorkNew York City Area2/18/2014 2:27:27 PMConstruction7th Avenue
constructionGoulden AvenueeventNYSDOT - Region 11: construction on Goulden Avenue both directions between Sedgwick Avenue (New York) and 205th Street to facilitate NYCDEP water main project., Continuous Tuesday February 18th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM 1 lane openBronxNew York City Area2/18/2014 4:17:22 PMConstructionGoulden Avenue
closure special eventStone StreeteventNYC DOT: special event on Stone Street between Hanover Square and Broad Street and Mill Lane between Stone Street (Manhattan)and South William Street (Manhattan) Stone Street Pedestrian Mall, Saturday March 15th, 2014 thru Sunday November 30th, 2014, Sunday thru Saturday, 10:00 AM thru 10:00 PM, all lanes closedNew YorkNew York City Area3/4/2014 6:55:51 PMClosure Special EventsStone Street
constructionNY 353eventNYSDOT: construction work, single line traffic alternating directions, temporary traffic lights on NY 353 in both directions from Blendinger Road to Town of Persia; Town of New Albion Line -- look out for flagger starting 7:00:00 AM, 3/10/2014 until further notice on weekday(s) and Saturday(s). Comment: Workzone is between West Street & Leavenworth Street.CattaraugusNiagara Buffalo Area10/23/2014 10:28:55 AMConstructionNY 353
constructionNY 481eventNYSDOT - Region 3: bridge rehabilitation and longterm construction on NY 481 northbound at Onondaga - Oswego County Line (Schroeppel) over Oneida River, Continuous Tuesday September 23rd, 2014 7:00 AM thru Friday October 31st, 2014 7:00 PM left lane closedOswegoCentral Syracuse Utica Area9/23/2014 2:40:32 PMConstructionNY 481
constructionNY 481eventNYSDOT - Region 3: bridge rehabilitation and longterm construction on NY 481 southbound at Onondaga - Oswego County Line (Schroeppel) over Oneida River, Continuous Tuesday September 23rd, 2014 7:00 AM thru Friday October 31st, 2014 7:00 PM left lane closedOswegoCentral Syracuse Utica Area9/23/2014 2:42:49 PMConstructionNY 481
closure incidentNY 265eventNYSDOT: closed to traffic on NY 265 in both directions from Saunders Settlement Road; NY 31; Witmer Road to Exit- Upper Mountain Road; Military Road; CR 11 -- detour in operation starting 7:00:00 AM, 3/17/2014 until further notice.NiagaraNiagara Buffalo Area10/15/2014 10:49:25 AMClosure IncidentsNY 265
constructionI-190eventNYSDOT: construction work, left lane closed on I-190 southbound from Town of Lewiston; Town of Niagara Line to Exit 25A - NY 265 Military Road starting 7:00:00 AM, 3/17/2014 until further notice. Comment: Work zone is I-190 over NYPA Resevoir.NiagaraNiagara Buffalo Area10/15/2014 8:39:16 AMConstructionI-190
constructionUS 9eventNYSDOT: bridge construction on US 9 in both directions at Latham Circle; Troy Schenectady Road; NY 2 -- approach with care starting 7:00:00 AM, 3/17/2014 until further notice. Comment: There will be various single lane closures between Kunker Ave and Erin St. This lane closures will take place 24 hours a day.AlbanyCapital Region Albany Saratoga Area7/7/2014 1:21:20 PMConstructionUS 9
constructionI-88eventNYSDOT - Region 9: Construction, construction on I-88 both directions between Exit 4 - NY 7 (Colesville) and Exit 5 - Martin Hill Road; I-88 ramps (Exit 5) to NY 7; Ramp (Colesville) alternate lanes closed for bridge work. Work is scheulded daily from 7 am to 3:30 pm until 10/31/14. D262423 IR # 25451BroomeSouthern Tier Homell Elmira Binghamton Area9/5/2014 10:58:43 AMConstructionI-88
constructionNY 22BeventNYSDOT: bridge construction, reduced to one lane on NY 22B from after Felton Road; CR 40 to before END ROUTE; Ramp until 4:00 PM, 11/30/15. Comment: Traffic is reduced to one lane on the temporary bridge. Traffic is controlled by traffic signals.ClintonAdirondack Watertown Plattsburgh Area6/11/2014 2:55:27 PMConstructionNY 22B
constructionNY 100eventNYSDOT - Region 8: roadwork on NY 100 both directions between Exit - Sprain Brook State Parkway Northbound (Mount Pleasant) and Joyce Place (Mount Pleasant) , Continuous Friday April 4th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM 1 lane closedWestchesterHudson Valley Catskill Area4/4/2014 6:20:32 AMConstructionNY 100
constructionNY 31eventNYSDOT - Region 3: bridge work on NY 31 eastbound at NY 690 (Van Buren) , Continuous Monday March 31st, 2014 7:00 AM thru Friday October 31st, 2014 7:00 PM right lane closedOnondagaCentral Syracuse Utica Area8/26/2014 11:05:40 AMConstructionNY 31
constructionI-84eventNYSDOT - Region 8: Construction, roadwork on I-84 both directions between Pennsylvania State Line (I-84) (Port Jervis) and Exit 1 (I-84) - Port Jervis (US 6) (Deerpark) at least one lane closed until 11:59 P.M. on December 31, 2014 The closures are weather dependent.OrangeHudson Valley Catskill Area4/20/2014 7:03:48 AMConstructionI-84
constructionNY 17eventNYSDOT: reduced to one lane on NY 17 in both directions from Exit 58 - Lowman Crossover; Ramp to Exit 59 - NY 427; Ramp due to long term road construction starting 7:00 AM, 03/28/14 until 6:00 PM, 11/30/14. Comment: Bridge deck and substructure repairs, I-86 over the Chemung River.ChemungSouthern Tier Homell Elmira Binghamton Area3/26/2014 3:23:46 PMConstructionNY 17
constructionNY 17eventNYSDOT: reduced to one lane on NY 17 in both directions from Exit 59 - NY 427; Ramp to Town of Chemung; Town of Barton Line; Chemung-Tioga County Line due to long term road construction starting 7:00 AM, 04/01/14 until 6:00 PM, 11/30/14. Comment: Long-Term Over-night , Lane Closure. Bridge deck and substructure repairs, I-86 over the Parshalls Cove and NSRR.ChemungSouthern Tier Homell Elmira Binghamton Area3/26/2014 3:40:22 PMConstructionNY 17
constructionNY 690eventNYSDOT - Region 3: bridge rehabilitation and longterm construction on NY 690 southbound between NY 31; NY 370 (Lysander) and Downer Street Road; NY 31 (Van Buren) southbound traffic crossed over into northbound lanes, Continuous Tuesday April 8th, 2014 4:00 PM thru Friday October 31st, 2014 7:00 PMOnondagaCentral Syracuse Utica Area8/26/2014 11:09:11 AMConstructionNY 690
constructionNY 5eventNYSDOT: bridge construction, new road layout on NY 5 in both directions from US 20 Junction to Route 438 Flat Road starting 7:30:00 AM, 3/28/2014 until further notice. Comment: New traffic pattern effective 6/13/14. Milestrip will be used as detour Routes 5 & 20 for milling and paving.ErieNiagara Buffalo Area10/23/2014 10:32:21 AMConstructionNY 5
constructionUS 9eventNYSDOT: single line traffic alternating directions, temporary traffic lights on US 9 in both directions at I-87 Exit 33; NY 22 due to road construction starting 6:30:00 AM, 3/31/2014 until further notice on weekday(s).EssexAdirondack Watertown Plattsburgh Area5/29/2014 2:08:45 PMConstructionUS 9
constructionI-87 NorthwayeventNYSDOT: long term road construction, reduced to one lane on I-87 Northway in both directions from Exit 32 -Garvey Mill Road to Exit 33; US 9; NY 22; Essex Ferry starting 6:30:00 AM, 3/31/2014 until further notice on weekday(s). Comment: This work will take place between 6:30am and 5:30pm Monday-Friday.EssexAdirondack Watertown Plattsburgh Area4/7/2014 4:27:47 PMConstructionI-87 Northway
constructionNY 370eventNYSDOT - Region 3: Construction, bridge work on NY 370 westbound at NY 31; Ramp (Lysander) right lane closed until 7:00 P.M. on October 31, 2014 under Route 690OnondagaCentral Syracuse Utica Area8/26/2014 11:17:08 AMConstructionNY 370
incidentNY 3eventNYSDOT: reduced to one lane on NY 3 from NY 342 to Town of Leray; Village of Black River due to bridge maintenance operations until 4:00 PM, 11/30/14. Comment: The bridge over the power canal is being rehabilitated. Beginning April 14, 2014 motorists will encounter alternating one way traffic controlled by traffic signals.JeffersonAdirondack Watertown Plattsburgh Area4/30/2014 3:12:02 PMIncidentsNY 3
constructionI-787eventNYSDOT: road construction on I-787 northbound from Exit 2; NY 32; South Pearl Street; Port of Albany to Exit 4B southbound; Clinton Avenue; US 9 -- approach with care starting 6:00:00 PM, 3/31/2014 until further notice. Comment: There will be various lane closures in the area. Use cautionAlbanyCapital Region Albany Saratoga Area8/12/2014 8:26:42 AMConstructionI-787
constructionNY 690eventNYSDOT - Region 3: Construction, bridge rehabilitation on NY 690 northbound between Downer Street Road; NY 31 (Van Buren) and NY 31; NY 370 (Lysander) left lane closed until 7:00 P.M. on October 31, 2014OnondagaCentral Syracuse Utica Area8/26/2014 11:20:07 AMConstructionNY 690
constructionUS 4eventNYSDOT: single line traffic alternating directions on US 4 in both directions from 2nd Avenue to Rensselaer-Saratoga County Line; Waterford Bridge due to bridge maintenance operations -- look out for flagger prepare to stop starting 9:00:00 AM, 4/14/2014 until further notice. Comment: This bridge will be reduced to one alternating lane of traffic, controlled by flaggers, during weekdays from 9 a.m. to 3 p.m.,RensselaerCapital Region Albany Saratoga Area9/5/2014 10:22:36 AMConstructionUS 4
constructionNY 98eventNYSDOT: road construction, single line traffic alternating directions on NY 98 from Main Street; NY 39 to Town of Java and Town of Arcade Line starting 7:57:00 AM, 4/17/2014 until further notice. Comment: RUNNING VAC CONWyomingNiagara Buffalo Area4/17/2014 7:57:30 AMConstructionNY 98
constructionNY 28NeventNYSDOT: single line traffic alternating directions, temporary traffic lights on NY 28N in both directions at END ROUTE NY 28; North Creek due to road construction starting 3:30 PM, 04/21/14 starting 3:30:00 PM, 4/21/2014 until further notice. Comment: This roadwork will be between Circle Ave and Bird Pond Rd in the town of North CreekWarrenAdirondack Watertown Plattsburgh Area4/21/2014 9:37:22 AMConstructionNY 28N
constructionI-787eventNYSDOT: road construction, reduced to one lane on I-787 in both directions from Exit 2; NY 32; South Pearl Street; Port of Albany to Exit 4 northbound; Quay Street; US 9; US 20; NY 32 starting 7:00:00 AM, 4/24/2014 until further notice. Comment: one lane of Interstate 787 northbound between exits 2 and 4 in Albany will be closed through the fall of 2014. The speed limit will be reduced to 45 MPH within the construction area.AlbanyCapital Region Albany Saratoga Area10/10/2014 11:53:02 AMConstructionI-787
constructionI-87 NorthwayeventNYSDOT: major road construction on I-87 Northway at Exit 42 - US 11 starting 8:00:00 AM, 4/29/2014 until further notice. Comment: The Route 11 bridge over I-87 is being replaced. This is a major project which will affect both I-87 and Route 11 in the vicintiy of the Route 11 interchange.ClintonAdirondack Watertown Plattsburgh Area4/29/2014 1:55:06 PMConstructionI-87 Northway
incidentI-87 NorthwayeventNYSDOT: reduced to one lane on I-87 Northway in both directions from END ROUTE I-87; US-Canadian Line to before Exit 42 - US 11 due to bridge construction starting 7:00:00 AM, 5/5/2014 until further notice. Comment: The contractor will be utilizing cross-overs on I87 to facilitate the reconstruction of the Route 11 bridge over I-87. Traffic will be reduced to a single lane.ClintonAdirondack Watertown Plattsburgh Area6/25/2014 8:30:13 AMIncidentsI-87 Northway
constructionNY 26eventNYSDOT: road construction on NY 26 between Town of Lowville; Town of Denmark and NY 410 starting 7:00:00 AM, 5/5/2014 until further notice. Comment: This work is for culvert repairs.LewisAdirondack Watertown Plattsburgh Area5/5/2014 11:43:59 AMConstructionNY 26
constructionI-90eventNYSDOT: bridge construction on I-90 west between Exit 11E; US 9 north; US 20 east (Schodack) and Exit 11W; US 9 south; US 20 west (Schodack) approach with careRensselaerCapital Region Albany Saratoga Area10/23/2014 10:14:35 AMConstructionI-90
constructionI-90eventNYSDOT: bridge construction on I-90 east between Exit 11W; US 9 south; US 20 west (Schodack) and Exit 11E; US 9 north; US 20 east (Schodack) approach with careRensselaerCapital Region Albany Saratoga Area10/23/2014 10:14:40 AMConstructionI-90
closure constructionI-86eventNYSDOT: closed to traffic, construction work on I-86 in both directions from Exit 21 - US 219 to Exit 23 - US 219 -- detour in operation starting 3:05:00 PM, 5/12/2014 until further notice.CattaraugusNiagara Buffalo Area10/6/2014 11:54:38 AMClosure ConstructionI-86
constructionNY 28eventNYSDOT - Region 2: bridge work on NY 28 both directions over NY 12 (Trenton) temporary traffic signal., Continuous Friday May 9th, 2014 3:15 PM thru Saturday December 31st, 2016 11:59 PM lane closedOneidaCentral Syracuse Utica Area5/9/2014 3:01:48 PMConstructionNY 28
constructionNY 28eventNYSDOT - Region 2: Construction, bridge work on NY 28 both directions over NY 12 (Trenton) lane closed until 11:59 P.M. on December 31, 2016 temporary traffic signal.OneidaCentral Syracuse Utica Area5/9/2014 3:15:24 PMConstructionNY 28
constructionUS 4eventNYSDOT: single line traffic alternating directions, temporary traffic lights on US 4 at William Street; CR 12 due to bridge construction starting 3:00 PM, 05/14/14 starting 3:00:00 PM, 5/14/2014 until further notice. Comment: This work will take place between Skenesborough Drive (Main St) and South Williams St in the town of Whitehall.WashingtonCapital Region Albany Saratoga Area5/14/2014 11:03:37 AMConstructionUS 4
constructionI-86eventNYSDOT: bridge construction, reduced to one lane on I-86 westbound from Exit 10 - NY 17; Ramp to Town of Ellicott; Town of Ellery Line starting 7:00:00 AM, 5/19/2014 until further notice. Comment: I-86 over Westman Road.ChautauquaNiagara Buffalo Area10/17/2014 3:10:19 PMConstructionI-86
constructionI-86eventNYSDOT: bridge construction, reduced to one lane on I-86 westbound from Town of Ellicott; Town of Poland Line to NY 394 starting 7:00:00 AM, 5/19/2014 until further notice. Comment: I-86 over Dry Brook Road.ChautauquaNiagara Buffalo Area10/17/2014 3:11:11 PMConstructionI-86
constructionI-890eventNYSDOT: bridge construction, left lane closed on I-890 westbound from Exit 5; Broadway to Exit 4B - I-890; City of Schenectady; Town of Rotterdam Line starting 7:00:00 AM, 5/19/2014 until further notice.SchenectadyCapital Region Albany Saratoga Area9/9/2014 8:48:55 PMConstructionI-890
constructionI-890eventNYSDOT: bridge construction, right lane closed on I-890 eastbound from Exit 4B - I-890; City of Schenectady; Town of Rotterdam Line to Exit 5; Broadway starting 7:00:00 AM, 5/19/2014 until further notice.SchenectadyCapital Region Albany Saratoga Area6/20/2014 9:23:37 AMConstructionI-890
closure incidentNY 474eventNYSDOT: closed to traffic on NY 474 in both directions from South Street; CR 33 to Town of North Harmony; Town of Busti Line -- detour in operation starting 5:11:00 PM, 5/21/2014 until further notice. Comment: Route 474 is closed between County Route 613 and Brooker Road.ChautauquaNiagara Buffalo Area9/11/2014 1:42:41 PMClosure IncidentsNY 474
constructionNY 28eventNYSDOT - Region 2: Construction, bridge replacement on NY 28 southbound between Town of Fairfield; Town of Newport Line (Newport) and Town of Newport; Village of Newport line (Newport) lane closure NY 28 bridge over White Creek between White Creek Road and Mechanic Street.HerkimerAdirondack Watertown Plattsburgh Area8/15/2014 1:26:12 PMConstructionNY 28
constructionNY 417eventNYSDOT: bridge construction on NY 417 in both directions at Town of Andover; Town of Wellsville Line starting 11:54:00 AM, 7/31/2014 until further notice. Comment: bridge construction in Wellsville until mid julyAlleganySouthern Tier Homell Elmira Binghamton Area9/12/2014 2:36:20 PMConstructionNY 417
constructionNY 19eventNYSDOT: major road construction on NY 19 in both directions from Town of Scio; Town of Wellsville Line to Town of Wellsville; Town of Willing Line due to reduced to one lane starting 4:56 PM, 08/01/14 starting 4:56:00 PM, 8/1/2014 until further notice. Comment: major road contructionAlleganySouthern Tier Homell Elmira Binghamton Area6/4/2014 11:57:51 AMConstructionNY 19
incidentNY 32eventNYSDOT - Region 8: Emergency construction on NY 32 both directions south of Broadway; NY 17K (Newburgh) all lanes of 2 lanes closed at Lake Drive until further noticeOrangeHudson Valley Catskill Area7/29/2014 11:21:51 AMIncidentsNY 32
constructionUS 62eventNYSDOT: construction work on US 62 in both directions from Tonawanda Creek Road to Niagara Falls Boulevard; Sheridan Drive -- look out for flagger until 3:30 PM, 10/25/14 on weekday(s) and Saturday(s). Comment: Right lane closures as needed. Left lane closure at Sheridan drive eastbound.ErieNiagara Buffalo Area10/17/2014 9:33:01 AMConstructionUS 62
constructionUS 11eventNYSDOT - Region 9: Construction on US 11 both directions between Exit - Front Street; Ramp (Binghamton) and Exit - Front Street; I-81 (Dickinson) alternate lanes closed periodically for the duration of the project. This is long term construction. D261771 IR 25432BroomeSouthern Tier Homell Elmira Binghamton Area6/14/2014 4:27:29 PMConstructionUS 11
closure constructionNY 7eventNYSDOT - Region 9: Construction on NY 7 eastbound between NY 363 (Binghamton) and Exit 73 - I-81 (Binghamton) entrance ramp closed to I-81 south. This is long term construction. D261771 IR 25432BroomeSouthern Tier Homell Elmira Binghamton Area6/14/2014 4:33:55 PMClosure ConstructionNY 7
closure constructionI-81eventNYSDOT - Region 9: Construction on I-81 northbound at Exit 4 - NY 7; Ramp (Binghamton) exit ramp closed to SR 7 west. This is long term construction. D261771 IR 25432BroomeSouthern Tier Homell Elmira Binghamton Area6/14/2014 4:43:25 PMClosure ConstructionI-81
closure constructionI-81eventNYSDOT - Region 9: Construction, construction on I-81 southbound Exit 4 - NY 7; Ramp (Binghamton) exit ramp closed to SR 7 east and west. This is long term construction. D261771 IR 25432BroomeSouthern Tier Homell Elmira Binghamton Area6/14/2014 4:52:58 PMClosure ConstructionI-81
constructionI-278eventNYSDOT - Region 11: construction on I-278 westbound from 56th Street (New York) to 6th Avenue (New York) Motrists that need to exit at Belt Parkway must be in the left lane., Continuous Monday June 16th, 2014 12:00 AM thru Thursday October 30th, 2014 11:59 PM center lane closedKingsNew York City Area6/16/2014 1:19:20 PMConstructionI-278
constructionI-278eventNYSDOT - Region 11: construction on I-278 eastbound from Exit 11 - Victory Boulevard (Staten Island) to Manor Road (Staten Island) New Traffic Pattern in place. All lanes will be for through traffic. Motorists must use the right lane to exit off at Bradley Avenue or Todt Hill Road/Slosson Avenue., Continuous Monday June 16th, 2014 12:00 AM thru Sunday November 30th, 2014 11:59 PMRichmondNew York City Area8/13/2014 12:30:38 PMConstructionI-278
closure constructionI-590eventNYSDOT: construction work, exit ramp closed on I-590 northbound at Monroe Avenue; NY 31; Ramp starting 3:05:00 PM, 6/16/2014 until further notice. Comment: The I-590 NB ramp to Monroe Ave westbound is closed until further notice due to construction. All I-590 NB traffic exiting at Monroe Ave must use the Eastbound ramp.MonroeFinger Lakes Rochester Area6/16/2014 3:07:38 PMClosure ConstructionI-590
closure constructionUS 4eventNYSDOT: bridge construction, closed to traffic on US 4 in both directions at City of Mechanicville; Town of Stillwater Line; Ramp -- follow detour signs until 5:00 PM, 11/28/14. Comment: Rte 4 is closed between Frances St and William St in the city of Mechanicville. Posted Detour- Rte 4 NB take Rte 4/32 to Rte 146 to I-87 Nb at Exit 9. Take Exit 11 and turn right Follow Round Lake Bypass to Rte 67 east. Follow Rte 67 east to rejoin Rte 4/32 Nb in Mechanicville. Rte 4 Sb take Rte 67 west to Round Lake Bypass enter I-87 Sb at Exit 11. Take Exit 9E to Rte 146 East. Follow Rte 146 to the end; take a right onto Rte 4/32 south of Mechanicville.SaratogaCapital Region Albany Saratoga Area6/17/2014 5:08:37 PMClosure ConstructionUS 4
closure constructionNY 12eventNYSDOT - Region 2: Construction on NY 12 southbound ramp from NY 5S; NY 5A (Utica) exit ramp closed until fall of 2015. Detour signs in place.OneidaCentral Syracuse Utica Area6/20/2014 3:42:24 PMClosure ConstructionNY 12
constructionNY 3eventNYSDOT: construction work, paving operations on NY 3 from CR 36; NY 3A to Jefferson County; Lewis County Line starting 9:54:00 AM, 6/24/2014 until further notice. Comment: Milled pavement surfaces at 3 locations. Paving is expected to begin on June 30th through July 2, expect minor delays. Two way alternating traffic will be controlled by flaggers.JeffersonAdirondack Watertown Plattsburgh Area6/24/2014 10:05:20 AMConstructionNY 3
constructionNY 55eventNYSDOT - Region 8: Construction, roadwork on NY 55 both directions between Taconic State Parkway; Ramp (La Grange) and Lauer Road (La Grange) various lane closures until 11:59 P.M. on December 31, 2014DutchessHudson Valley Catskill Area6/25/2014 10:45:17 AMConstructionNY 55
constructionNY 384eventNYSDOT: construction work, reduced to one lane on NY 384 in both directions from Knoche Road to Junction I-290 Youngmann Expressway starting 7:00:00 AM, 7/14/2014 until further notice on weekday(s).ErieNiagara Buffalo Area10/17/2014 10:35:26 AMConstructionNY 384
transit incidentE, F, M & 6 TraineventMTA NYC Transit Subway: due to Elevator Malfunction E, F, M & 6 Train at Lexington Avenue/ 53rd Street Station (Manhattan) no elevator service until Feb 2015, due to replacement of elevator #401New YorkNew York City Area10/19/2014 2:33:54 AMTransit IncidentsE, F, M & 6 Train
constructionNY 28eventNYSDOT - Region 2: bridge rehabilitation on NY 28 both directions north of CR 61; Woodgate (Forestport) NY 28 over Moose River with temporary traffic signal, Continuous Tuesday July 22nd, 2014 7:00 AM thru Sunday November 30th, 2014 5:00 PMOneidaCentral Syracuse Utica Area7/22/2014 12:59:22 PMConstructionNY 28
constructionNY 85AeventNYSDOT: single line traffic alternating directions, temporary traffic lights on NY 85A in both directions at Altamont Road; NY 156 due to bridge construction -- prepare to stop until 5:00 PM, 10/31/14. Comment: This work will be on the bridge over the Vly Creek. There will be alternating one way traffic 24 hours a day until October 31stAlbanyCapital Region Albany Saratoga Area9/22/2014 11:50:29 AMConstructionNY 85A
constructionNY 16eventNYSDOT: construction work, single line traffic alternating directions on NY 16 in both directions from Town of Ischua; Town of Hinsdale Line to Town of Franklinville; Town of Ischua Line -- look out for flagger starting 5:30:00 PM, 7/29/2014 until further notice on weekday(s). Comment: Workzone is between Farwell Road and Airport Road.CattaraugusNiagara Buffalo Area10/17/2014 7:52:35 AMConstructionNY 16
closure incidentLake Ontario State ParkwayeventNYSDOT: closed to traffic on Lake Ontario State Parkway in both directions at Exit - Entrance Hamlin Beach State Park starting 11:28:00 AM, 7/25/2014 until further notice. Comment: The LOSP East Bound and Westbound bridges over ramps I & J to Hamlin beach Park are closed. Please follow the detour.MonroeFinger Lakes Rochester Area7/25/2014 11:31:40 AMClosure IncidentsLake Ontario State Parkway
constructionNY 39eventNYSDOT: road construction on NY 39 in both directions from Town of Yorkshire and Town of Arcade Line; Countyline Road; Stephen Park Road to before Town of Eagle and Town of Arcade Line starting 7:00 AM, 07/28/14 starting 7:00:00 AM, 7/28/2014 until further notice. Comment: Road construction in the Village of Arcade on Rte 39 and Rte 98. Expect delays. Alternating one way traffic and night time work.WyomingNiagara Buffalo Area7/25/2014 3:01:47 PMConstructionNY 39
constructionNY 265eventNYSDOT: construction work, reduced to one lane on NY 265 in both directions from Knoche Road to I-290; Youngmann Expressway starting 7:00:00 AM, 7/28/2014 until further notice on weekday(s).ErieNiagara Buffalo Area10/17/2014 10:34:53 AMConstructionNY 265
constructionRobert Moses State ParkwayeventNYSDOT: construction work, left shoulder closed on Robert Moses State Parkway in both directions at Pletcher Road; Ramp starting 7:12:00 AM, 7/29/2014 until further notice.NiagaraNiagara Buffalo Area9/11/2014 9:31:31 AMConstructionRobert Moses State Parkway
transit construction# 6 LineeventMTA NYC Transit Subway: due to Construction, Bronx Bound # 6 Line at 3rd Avenue-138th Street Station (Bronx) is the last stop for some trains headed toward Pelham Bay Park, Wednesday October 15th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 09:30 AM thru 03:00 PM,BronxNew York City Area10/20/2014 6:06:56 PMTransit Construction# 6 Line
constructionI-86eventNYSDOT: bridge construction, reduced to one lane on I-86 eastbound from NY 394 to Exit 14 - NY 62 Frewsburg Road starting 7:28:00 AM, 8/1/2014 until further notice. Comment: I-86 over Route 394, and over WNY & Pennsylvania RR and Conewango River.ChautauquaNiagara Buffalo Area10/17/2014 3:08:10 PMConstructionI-86
constructionI-86eventNYSDOT: bridge construction, reduced to one lane on I-86 eastbound from North Main Street Extension; NY 60 to Exit 13 - East Main Street Extension Connector starting 7:00:00 AM, 8/1/2014 until further notice. Comment: I-86 over Curtis Road.ChautauquaNiagara Buffalo Area10/6/2014 12:00:14 PMConstructionI-86
constructionNY 68eventNYSDOT: construction work, paving operations on NY 68 from Commerce Street to Canton Street starting 7:00 AM, 08/27/14 until 5:00 PM, 10/31/14. Comment: State Maintenance will be working with contractors to Heater Scarify State Street in advance of a VPP by Barrett paving on this stretch of roadway. Traffic will be delayed shortly during both operations.St. LawrenceAdirondack Watertown Plattsburgh Area8/21/2014 4:01:41 PMConstructionNY 68
constructionI-86eventNYSDOT: construction work on I-86 eastbound from Exit 20 - NY 417 to Exit 21 - US 219 starting 9:00:00 AM, 8/7/2014 until further notice on weekday(s). Comment: Shoulder closures will be used as needed.CattaraugusNiagara Buffalo Area10/23/2014 8:47:24 AMConstructionI-86
constructionI-88eventNYSDOT: road construction, reduced to one lane on I-88 westbound from Exit 25; NY 7 to NY State Thruway interchange 25A Toll Booths starting 8:51:00 AM, 8/15/2014 until further notice. Comment: I-88 Westbound between Exit 25 and Normanskill Bridge and I-88 Westbound from Darby Hill Road to Schohharie County line there is a double right lane closure due to roadwork.SchenectadyCapital Region Albany Saratoga Area8/15/2014 9:07:19 PMConstructionI-88
constructionI-88eventNYSDOT: road construction, reduced to one lane on I-88 westbound from Exit 25; NY 7 to NY State Thruway interchange 25A Toll Booths starting 8:59 AM, 08/19/14 starting 8:59:00 AM, 8/19/2014 until further notice. Comment: I-88 Westbound between Exit 25 and Normanskill Bridge and I-88 Westbound from Darby Hill Road to Schohharie County line there is a double right lane closure due to roadwork.SchenectadyCapital Region Albany Saratoga Area8/15/2014 9:07:04 PMConstructionI-88
constructionI-88eventNYSDOT: road construction, reduced to one lane on I-88 westbound at Town of Rotterdam; Town of Princetown Line starting 7:03 AM, 08/20/14 starting 7:03:00 AM, 8/20/2014 until further notice. Comment: I-88 Westbound between Exit 25 and Normanskill Bridge and I-88 Westbound from Darby Hill Road to Schohharie County line there is a double right lane closure due to roadwork. .SchenectadyCapital Region Albany Saratoga Area8/15/2014 9:07:11 PMConstructionI-88
constructionI-88eventNYSDOT: road construction, reduced to one lane on I-88 westbound from Exit 25; NY 7 to NY State Thruway interchange 25A Toll Booths starting 9:07 AM, 08/21/14 starting 9:07:00 AM, 8/21/2014 until further notice. Comment: I-88 Westbound between Exit 25 and Normanskill Bridge and I-88 Westbound from Darby Hill Road to Schohharie County line there is a double right lane closure due to roadwork.SchenectadyCapital Region Albany Saratoga Area8/15/2014 9:09:47 PMConstructionI-88
constructionNY 206eventNYSDOT - Region 9: Construction, construction on NY 206 both directions between CR 17 (Bainbridge) and Newton Hollow Road alternate lanes closed for drainage work. Work is from 7:00 am to 5:00 pm, 8/20/14 to 10/31/14. D262214 IR 25961ChenangoCentral Syracuse Utica Area9/11/2014 3:53:48 PMConstructionNY 206
constructionNY 25eventNYSDOT - Region 11: construction on NY 25 both directions over Van Wyck Expressway (New York) , Continuous Monday August 18th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM 1 lane closed, Continuous Monday August 18th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM 2 lanes openQueensNew York City Area8/18/2014 2:15:08 PMConstructionNY 25
constructionI-278eventNYSDOT - Region 11: construction on I-278 westbound from 52nd Street (New York) to 6th Avenue (New York) A cattle-chute is in place, all lanes are for through traffic. Motorists must use the left lane to exit at Belt Parkway., Continuous Tuesday August 19th, 2014 12:00 AM thru Sunday November 30th, 2014 11:59 PM center lane closedKingsNew York City Area9/30/2014 1:48:27 PMConstructionI-278
incidentUS 11eventNYSDOT: closed on US 11 at Railroad starting 3:52:00 PM, 8/21/2014 until further notice. Comment: Rt 11 Closed to car traffic due to flooding at the RR underpass just North of Canton. Large trucks and trailers allowed to pass. Heavy rain caused problems.St. LawrenceAdirondack Watertown Plattsburgh Area8/21/2014 4:03:24 PMIncidentsUS 11
constructionI-278eventNYSDOT - Region 11: construction on I-278 both directions at Shore Parkway; Belt System - Shore Parkway (New York) The Fly-over ramp (left lane) of the Eastbound Gowanus Expressway is being used as the HOV lane from 6am to 10a. After the morning HOV lane hours, this lane wil be use as an additional westbound lane between 56th Street and Bay Ridge Parkway., Continuous Friday August 22nd, 2014 12:00 AM thru Sunday May 31st, 2015 11:59 PM all lanes openKingsNew York City Area8/22/2014 4:38:17 PMConstructionI-278
constructionI-278eventNYSDOT - Region 11: construction on I-278 westbound between Exit - 67th Street; Ramp; Ovington Avenue (New York) and Bay Ridge Parkway; Ramp (New York) , Continuous Friday August 22nd, 2014 12:00 AM thru Monday August 31st, 2015 11:59 PM left lane closedKingsNew York City Area8/22/2014 4:40:09 PMConstructionI-278
transit constructionGeorge Washington Bridge Bus StationeventPA - Bus Terminal Info Desk: due to Station Renovations, George Washington Bridge Bus Station at Broadway:178th Street (Manhattan) Bus station closed. Jitney, long haul, and local buses will operate along the perimeter of the top level of the bus station. Departing passengers will access their bus platform via a temporary staircase on Fort Washington Avenue and 179th Street. Arriving passengers will exit their bus platform via an existing staircase to 178th Street. Customers can enter the Subway at 177th. Pickup for disabled passengers will remain on Fort Washington Avenue., Continuous Monday August 25th, 2014 12:00 AM thru Tuesday August 25th, 2015 11:59 PM ,New YorkNew York City Area8/25/2014 5:16:48 AMTransit ConstructionGeorge Washington Bridge Bus Station
constructionEast Houston StreeteventNYSDOT - Region 11: construction on East Houston Street eastbound between Bowery (New York) and Suffolk Street (New York) to facilitate NYCDDC roadway reconstruction, Continuous Monday August 25th, 2014 12:00 AM thru Sunday November 30th, 2014 11:59 PM 2 lanes openNew YorkNew York City Area8/26/2014 8:46:43 AMConstructionEast Houston Street
closure constructionAvenue DeventNYSDOT - Region 11: construction on Avenue D both directions between East 12th Street (New York) and East 13th Street (New York) to facilitate a NYCDEP pumping station capital project, Continuous Monday August 25th, 2014 12:00 AM thru Saturday December 31st, 2016 11:59 PM all lanes closedNew YorkNew York City Area8/26/2014 8:41:56 AMClosure ConstructionAvenue D
constructionI-278eventNYSDOT - Region 11: construction on I-278 both directions at Belt Parkway/Shore Parkway (Brooklyn) New Traffic Pattern: The left lane of the eastbound Gowanus Expressway is being used as the HOV lane From 6am to 10am. After the morning HOV lane hours, this lane will be used as an additional westbound lane between 56th Street and Bay Ridge Parkway. In conjunction with the traffic configuration, the left lane of the westbound Gowanus Expressway between Ovington Avenue and Bay Ridge Parkway will be permanently closed until May 2015, Continuous Monday August 25th, 2014 12:00 AM thru Monday August 31st, 2015 11:59 PMKingsNew York City Area8/26/2014 3:30:58 PMConstructionI-278
constructionEast 63rd StreeteventNYSDOT - Region 11: construction on East 63rd Street westbound between 3rd Avenue (New York) and Park Avenue (New York) , Tuesday August 26th, 2014 thru Wednesday December 31st, 2014, Sunday thru Saturday, 12:00 AM thru 11:59 PM, 1 to 2 lanes openNew YorkNew York City Area8/26/2014 8:56:46 AMConstructionEast 63rd Street
closure construction149th Street BridgeeventNYSDOT - Region 11: bridge rehabilitation on 149th Street Bridge both directions between 41st Avenue (Queens) and Roosevelt Avenue (Queens) , Continuous Tuesday August 26th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM all lanes closedQueensNew York City Area8/26/2014 9:28:06 AMClosure Construction149th Street Bridge
constructionI-678eventNYSDOT - Region 11: construction on I-678 northbound between Queens Boulevard; NY 25 (New York) and Grand Central Parkway (New York) New Traffic Pattern will be in effect on September 3rd 2014 on the Northbound Van Wyck Expressway from Queens Boulevard to the Grand Central Parkwway Van Wyck Expressway split. The three lanes of the roadway will be shifted to the right after the the Queens Boulevard ramp keeping the traffic on the newly constructed roadway. This new traffic pattern will maintain the work zone at the left side of the traffic for pavement removal and replacement work. All work will be done by mid October, Thursday August 28th, 2014 thru Friday October 31st, 2014, Sunday thru Saturday, 12:00 AM thru 11:59 PM, openQueensNew York City Area8/28/2014 9:35:04 AMConstructionI-678
constructionI-290eventNYSDOT: bridge construction, left shoulder closed on I-290 in both directions from Exit 4 - I-990 Lockport Expressway to Exit 5A- NY 263 Millersport Highway starting 7:00:00 AM, 9/3/2014 until further notice on weekday(s). Comment: Maple Road bridge over I-290ErieNiagara Buffalo Area10/16/2014 1:56:18 PMConstructionI-290
constructionI-390eventNYSDOT: bridge maintenance operations on I-390 in both directions from Town of Cohocton; Town of Avoca Line to Town of Cohocton; Town of Wayland Line due to reduced to one lane starting 1:12:00 PM, 8/28/2014 until further notice. Comment: Bridge paintingSteubenSouthern Tier Homell Elmira Binghamton Area8/28/2014 1:12:53 PMConstructionI-390
transit constructionRonkonkoma BrancheventMTA Long Island Rail Road: due to Construction, Ronkonkoma Branch Ronkonkoma Station (Suffolk County) to Greenport Station (Suffolk County) buses replace four off-peak, midday trains on weekdays between Ronkonkoma & Greenport as trackwork is performed. Westbound buses depart up to 10 minutes earlier than normal train departure time., Tuesday September 2nd, 2014 thru Friday November 14th, 2014, Sunday thru Saturday, 12:00 AM thru 11:59 PM,, Tuesday September 2nd, 2014 thru Friday November 14th, 2014, Sunday thru Saturday, 09:30 AM thru 03:15 PM,SuffolkLong Island Area8/29/2014 9:30:46 AMTransit ConstructionRonkonkoma Branch
closure constructionNY 365eventNYSDOT - Region 2: bridge work on NY 365 westbound Ramp to NY 49 Westbound (Rome) ramp closed with detour signs in place, Continuous Tuesday September 2nd, 2014 8:40 AM thru Sunday November 30th, 2014 5:00 PM exit ramp closedOneidaCentral Syracuse Utica Area9/2/2014 8:36:20 AMClosure ConstructionNY 365
transit construction# 4 LineeventMTA NYC Transit Subway: due to Construction, both directions # 4 Line between 42nd Street-Grand Central Station (Manhattan) and Brooklyn Bridge-City Hall Station (Manhattan) , Tuesday October 14th, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 12:01 AM thru 05:00 AM, local service onlyNew YorkNew York City Area10/17/2014 10:42:44 AMTransit Construction# 4 Line
transit construction# 7 LineeventMTA NYC Transit Subway: due to Construction, eastbound # 7 Line between Queensboro Plaza Station (Queens) and 74th Street-Broadway Station (Queens) trains stop at 61st St-Woodside, Wednesday October 22nd, 2014 thru Friday October 31st, 2014 Wednesday/ Thursday/ Friday, 10:15 AM thru 03:00 PM, express onlyQueensNew York City Area10/20/2014 6:31:46 PMTransit Construction# 7 Line
constructionI-84eventNYSDOT - Region 8: roadwork on I-84 both directions at Exit 4 (I-84) - NY17 to Binghamton/NYC (Wallkill) , Friday October 24th, 2014 thru Sunday October 26th, 2014 Sunday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, left shoulder closures, Monday October 27th, 2014 thru Sunday November 2nd, 2014, Sunday thru Saturday, 09:00 AM thru 03:00 PM, left shoulder closuresOrangeHudson Valley Catskill Area10/23/2014 6:12:48 AMConstructionI-84
closure constructionNY 49eventNYSDOT - Region 2: Construction, bridge work on NY 49 westbound between Exit - South L Access Road (Rome) and Exit - Wright Drive (Rome) westbound all lanes closed until 5:00 P.M. on November 30, 2014 Westbound traffic shifted to eastbound sideOneidaCentral Syracuse Utica Area9/3/2014 1:45:23 PMClosure ConstructionNY 49
constructionNY 193eventNYSDOT: reduced to one lane on NY 193 between START ROUTE NY 193; NY 3 and CR 120 Junction due to bridge maintenance operations starting 7:00 AM, 09/09/14 until 5:00 PM, 10/31/14. Comment: Traffic on the bridge carrying Rt. 193 over sandy Creek will be reduced to one lane, controlled by temporary traffic signals.Speed will also be reduced to 45 MPH. This is to facilitate bridge painting operations at the site.JeffersonAdirondack Watertown Plattsburgh Area9/3/2014 1:53:36 PMConstructionNY 193
constructionI-690eventNYSDOT - Region 3: bridge work on I-690 eastbound between Exit 10 - Geddes Street (Syracuse) and Exit 11 - West Street (Syracuse) , Friday September 19th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closedOnondagaCentral Syracuse Utica Area9/19/2014 9:27:57 AMConstructionI-690
constructionNY 146eventNYSDOT: single line traffic alternating directions on NY 146 in both directions from Vischer Ferry Road; NY 146A; CR 90 to Riverview Road; CR 88 due to road construction -- look out for flagger starting 7:00 PM, 09/15/14 until 6:00 AM, 10/24/14. Comment: There will be alternating one way traffic in the area between 7pm and 6am due to paving. Use caution and expect delays.SaratogaCapital Region Albany Saratoga Area9/12/2014 12:31:41 PMConstructionNY 146
transit construction# 6 LineeventMTA NYC Transit Subway: due to Construction, northbound # 6 Line between 3rd Avenue-138th Street Station (Bronx) and Parkchester-E 177th Street Station (Bronx) , Wednesday September 17th, 2014 thru Friday October 31st, 2014 Wednesday/ Thursday/ Friday, 01:00 PM thru 03:00 PM, local service onlyBronxNew York City Area10/16/2014 9:10:09 AMTransit Construction# 6 Line
constructionI-690eventNYSDOT - Region 3: roadwork on I-690 westbound between I-81 Southbound (Syracuse) and Exit 11 and Exit 12 - West Street Arterial; West Genesee Street (Syracuse) , Friday September 19th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closedOnondagaCentral Syracuse Utica Area9/19/2014 9:31:16 AMConstructionI-690
constructionNY 104eventNYSDOT: bridge construction on NY 104 west between Ridge Road; NY 18F; Ramp (Lewiston) and Exit - Robert Moses Parkway (Lewiston)NiagaraNiagara Buffalo Area10/23/2014 10:14:45 AMConstructionNY 104
constructionNY 93eventNYSDOT: construction work, right shoulder closed on NY 93 in both directions from Town of Lockport; Town of Pendleton Line; South Transit Road; NY 78 to Beattie Avenue; CR 14 starting 6:00:00 AM, 9/15/2014 until further notice on weekday(s).NiagaraNiagara Buffalo Area10/16/2014 8:00:43 AMConstructionNY 93
constructionUS 11eventNYSDOT - Region 3: bridge painting on US 11 both directions between Clinton Avenue; NY 222; NY 13 (Cortland) and City of Cortland; Town of Cortlandville Line (Cortlandville) over Tioughnioga River, Continuous Monday September 15th, 2014 9:00 AM thru Saturday November 15th, 2014 3:30 PM 1 lane closedCortlandCentral Syracuse Utica Area9/12/2014 12:32:09 PMConstructionUS 11
closure constructionNY 85eventNYSDOT: road construction, closed to traffic on NY 85 eastbound at Exit to Washington Avenue -- right entrance ramp starting 9:04 AM, 09/15/14 until 12:00 AM, 12/02/14. Comment: Washington Ave Eastbound Ramp to Route 85 Eastbound CLOSED - Follow Posted DetourAlbanyCapital Region Albany Saratoga Area9/12/2014 5:26:55 PMClosure ConstructionNY 85
closure constructionNY 85eventNYSDOT: road construction, closed to traffic on NY 85 westbound at Exit to Washington Avenue -- right entrance ramp starting 9:00 AM, 09/15/14 until 12:00 AM, 12/02/14. Comment: Washington Ave Westbound ramp to Route 85 West CLOSED - Follow Posted DetourAlbanyCapital Region Albany Saratoga Area9/12/2014 5:25:31 PMClosure ConstructionNY 85
constructionUS 11eventNYSDOT - Region 3: Construction, bridge painting on US 11 both directions between Clinton Avenue; NY 222; NY 13 (Cortland) and City of Cortland; Town of Cortlandville Line (Cortlandville) 1 lane closed until 3:30 P.M. on November 15, 2014 over Tioughnioga RiverCortlandCentral Syracuse Utica Area9/15/2014 9:01:13 AMConstructionUS 11
closure constructionNY 85eventNYSDOT: road construction on NY 85 east at Exit to Washington Avenue (Albany) right entrance ramp closed to traffic until 12:00 A.M. Tuesday, December 2, 2014. Comment: Washington Ave Eastbound Ramp to Route 85 Eastbound CLOSED - Follow Posted DetourAlbanyCapital Region Albany Saratoga Area9/16/2014 8:50:51 AMClosure ConstructionNY 85
closure constructionNY 85eventNYSDOT: road construction on NY 85 west at Exit to Washington Avenue (Albany) right entrance ramp closed to traffic until 12:00 A.M. Tuesday, December 2, 2014. Comment: Washington Ave Westbound ramp to Route 85 West CLOSED - Follow Posted DetourAlbanyCapital Region Albany Saratoga Area9/16/2014 8:50:57 AMClosure ConstructionNY 85
closure constructionNY 438eventNYSDOT: closed for repairs, bridge construction on NY 438 in both directions from US 20; END ROUTE; NY 438 to Town of Collins; Town of Brant Line -- detour in operation until 4:00 PM, 02/01/15.ErieNiagara Buffalo Area9/16/2014 10:34:08 AMClosure ConstructionNY 438
constructionNY 85eventNYSDOT: road construction, reduced to one lane on NY 85 westbound from Exit to Washington Avenue to Exit to State Office Campus until 12:00 AM, 12/02/14. Comment: RTE 85 Westbound from Washington Ave to State campus off ramp there will be a single lane closure due to bridge rehabilitationAlbanyCapital Region Albany Saratoga Area9/17/2014 12:00:26 PMConstructionNY 85
constructionNY 85eventNYSDOT: road construction, reduced to one lane on NY 85 eastbound from Exit to State Office Campus to Exit to Lincoln Avenue until 12:00 AM, 12/02/14. Comment: RTE 85 Eastbound from State campus off ramp to Lincoln Ave off ramp there will be a single lane closure due to bridge rehabilitationAlbanyCapital Region Albany Saratoga Area9/17/2014 12:02:20 PMConstructionNY 85
constructionNY 474eventNYSDOT: construction work, single line traffic alternating directions on NY 474 in both directions from South Street; CR 33 to Town of Clymer; Town of Harmony Line -- look out for flagger starting 7:02:00 AM, 9/18/2014 until further notice. Comment: Workzone is between Portage Rd and Pond RdChautauquaNiagara Buffalo Area10/10/2014 1:22:50 PMConstructionNY 474
construction3rd AvenueeventNYSDOT - Region 11: construction on 3rd Avenue between East 57th Street (New York) and East 59th Street to facilitate NYCDDC water main work., Thursday September 18th, 2014 thru Friday November 21st, 2014, Monday thru Friday, 12:01 AM thru 05:00 AM, 3 lanes openNew YorkNew York City Area9/18/2014 10:42:08 AMConstruction3rd Avenue
constructionBelt System - Shore ParkwayeventNYSDOT - Region 11: longterm construction on Belt System - Shore Parkway both directions between END ROUTE Belt System - Shore Parkway; Huron Street; Cross Bay Boulevard (New York) and 149th Street to facilitate NYCDEP sewer reconstruction, Thursday September 18th, 2014 thru Sunday July 31st, 2016, Monday thru Friday, 10:00 AM thru 02:00 PM, 1 lane closed, Thursday September 18th, 2014 thru Sunday July 31st, 2016, Monday thru Friday, 10:00 PM thru 01:00 AM, 1 lane closed, Friday September 19th, 2014 thru Sunday July 31st, 2016, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closedQueensNew York City Area9/18/2014 10:49:55 AMConstructionBelt System - Shore Parkway
closure constructionNY 384eventNYSDOT: closed, entrance ramp closed, bridge construction on NY 384 in both directions at I-190; Niagara Expressway -- detour in operation until 7:00 PM, 10/31/14. Comment: Buffalo Avenue will be closed between 63rd and 65th Streets. Buffalo Avenue entrance ramps to Northbound & Southbound I-190 will also be closed.NiagaraNiagara Buffalo Area10/16/2014 11:47:38 AMClosure ConstructionNY 384
closure constructionRobert Moses State ParkwayeventNYSDOT: entrance ramp closed, bridge construction on Robert Moses State Parkway southbound at START ROUTE Robert Moses State Parkway; I-190 -- detour in operation until 7:00 PM, 10/31/14. Comment: Entrance ramps from Robert Moses Parkway to I-190 will closed.NiagaraNiagara Buffalo Area10/16/2014 11:54:07 AMClosure ConstructionRobert Moses State Parkway
closure incidentI-190 - Niagara ThruwayeventNYSDOT: exit ramp closed on I-190 - Niagara Thruway in both directions at Exit N21 (I-190) - Robert Moses Parkway (Rte 384) due to bridge construction until 7:00 PM, 10/31/14. Comment: I-190 exit ramps to Buffalo Avenue will be closed. Northbound I-190 exit ramp to Robert Moses Parkway will remain open.NiagaraNiagara Buffalo Area10/10/2014 11:46:31 AMClosure IncidentsI-190 - Niagara Thruway
closure constructionNY 384eventNYSDOT: bridge construction on NY 384 both directions at I-190; Niagara Expressway (Niagara Falls) entrance ramp closed detour in operation until 4:00 P.M. Friday, October 31, 2014. Comment: Buffalo Avenue will be closed between 63rd and 65th Streets. Buffalo Avenue entrance ramps to Northbound & Southbound I-190 will also be closed.NiagaraNiagara Buffalo Area9/23/2014 6:48:43 AMClosure ConstructionNY 384
closure constructionRobert Moses State ParkwayeventNYSDOT: bridge construction on Robert Moses State Parkway south at START ROUTE Robert Moses State Parkway; I-190 entrance ramp closed detour in operation until 4:00 P.M. Friday, October 31, 2014. Comment: Entrance ramps from Robert Moses Parkway to I-190 will closed.NiagaraNiagara Buffalo Area9/23/2014 6:48:48 AMClosure ConstructionRobert Moses State Parkway
constructionNY 414eventNYSDOT: road construction, single line traffic alternating directions, paving operations on NY 414 from Kingdom Road to I-90 until 6:00 PM, 10/24/14 on weekday(s). Comment: Highway maintenance and paving operations on Route 414 from Balsey Road north to the Thruway exit. Alternating one way traffic with flagger stations. Expect delays as paving operations start on Tuesday 10/14/14.SenecaFinger Lakes Rochester Area10/14/2014 7:58:18 AMConstructionNY 414
transit construction# 2 LineeventMTA NYC Transit Subway: due to Construction, southbound # 2 Line between Atlantic Avenue Station (Brooklyn) and Franklin Avenue Station (Brooklyn) , Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM, express only, Continuous Friday October 24th, 2014 11:45 PM thru Monday October 27th, 2014 5:00 AM , express onlyKingsNew York City Area10/20/2014 1:35:30 PMTransit Construction# 2 Line
transit construction# 4 LineeventMTA NYC Transit Subway: due to Construction, southbound # 4 Line between Atlantic Avenue Station (Brooklyn) and Franklin Avenue Station (Brooklyn) , Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM, express only, Friday October 24th, 2014 thru Sunday October 26th, 2014 Friday/ Saturday, 11:45 PM thru 06:00 AM, express only, Sunday October 26th, 2014 thru Monday October 27th, 2014, 11:45 PM thru 05:00 AM, express onlyKingsNew York City Area10/20/2014 1:37:56 PMTransit Construction# 4 Line
constructionNY 481eventNYSDOT - Region 3: Construction, bridge rehabilitation on NY 481 northbound at Onondaga - Oswego County Line (Schroeppel) left lane closed until 7:00 P.M. on October 31, 2014 over Oneida RiverOswegoCentral Syracuse Utica Area9/23/2014 2:42:37 PMConstructionNY 481
constructionNY 481eventNYSDOT - Region 3: Construction, bridge rehabilitation on NY 481 southbound at Onondaga - Oswego County Line (Schroeppel) left lane closed until 7:00 P.M. on October 31, 2014 over Oneida RiverOswegoCentral Syracuse Utica Area9/23/2014 2:43:43 PMConstructionNY 481
constructionNY 5eventNYSDOT: construction work, reduced to one lane on NY 5 in both directions from City of Dunkirk to Central Avenue -- look out for flagger until 5:00 PM, 10/31/14 on weekday(s).ChautauquaNiagara Buffalo Area10/23/2014 10:41:53 AMConstructionNY 5
constructionNY 16eventNYSDOT: construction work on NY 16 south between City of Olean; Town of Olean Line (Olean) and Town of Olean; Town of Allegany Line (Allegany)CattaraugusNiagara Buffalo Area10/23/2014 10:14:56 AMConstructionNY 16
constructionNY 121eventNYSDOT - Region 8: roadwork on NY 121 both directions between Cantitoe Street; NY 22; Old Post Road; START ROUTE NY 121 (Bedford) and Upper Hook Road (Bedford) , Friday October 24th, 2014, 09:30 AM thru 03:00 PM, alternate lanes closures, Monday October 27th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 09:30 AM thru 03:00 PM, alternate lanes closures, Monday November 3rd, 2014 thru Friday November 7th, 2014, Monday thru Friday, 09:30 AM thru 03:00 PM, alternate lanes closures, Monday November 10th, 2014 thru Friday November 14th, 2014, Monday thru Friday, 09:30 AM thru 03:00 PM, alternate lanes closures, Monday October 20th, 2014 thru Saturday October 25th, 2014, Monday thru Friday, 08:30 PM thru 05:30 AM, alternate lanes closures, Monday OctobeWestchesterHudson Valley Catskill Area10/23/2014 6:19:01 AMConstructionNY 121
constructionTaconic State ParkwayeventNYSDOT - Region 8: roadwork on Taconic State Parkway southbound between Exit - NY 82 (East Fishkill) and James Baird State Park (La Grange) , Friday October 24th, 2014, 09:00 AM thru 05:00 PM, left lane closure, Monday October 27th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 09:00 AM thru 05:00 PM, left lane closure, Monday November 3rd, 2014 thru Friday November 7th, 2014, Monday thru Friday, 09:00 AM thru 05:00 PM, left lane closureDutchessHudson Valley Catskill Area10/23/2014 9:19:19 AMConstructionTaconic State Parkway
incidentI-81eventNYSDOT: reduced to one lane on I-81 in both directions at Exit 44; NY 232 due to bridge construction starting 9:10:00 AM, 9/29/2014 until further notice.JeffersonAdirondack Watertown Plattsburgh Area9/29/2014 9:11:55 AMIncidentsI-81
constructionI-84eventNYSDOT - Region 8: Roadwork on I-84 eastbound between Exit 12 (I-84) - Fishkill (NY 52) (Fishkill) and Exit 13 (I-84) - Poughkeepsie - Peekskill (US 9) (Fishkill), Saturday October 25th, 2014 thru Sunday October 26th, 2014, Saturday, 07:00 PM thru 09:00 AM, right lane, closure, Saturday October 25th, 2014 thru Sunday October 26th, 2014, Saturday, 07:00 PM thru 09:00 AM, right lane, closureDutchessHudson Valley Catskill Area10/20/2014 9:08:19 AMConstructionI-84
constructionNY 140eventNYSDOT: road construction, reduced to one lane on NY 140 in both directions from New Scotland Road; NY 85 to Delaware Avenue; NY 443 starting 7:00 PM, 10/06/14 until 7:00 AM, 10/31/14 on weekday(s). Comment: RTE 140 N/S between Delaware Ave (RTE 443) and Cherry Ave (Co, RTE 52) has an Alternating single lane closure in both directions with Flaggers due to Construction.AlbanyCapital Region Albany Saratoga Area10/6/2014 9:23:50 AMConstructionNY 140
constructionNY 32eventNYSDOT - Region 8: roadwork on NY 32 southbound between Falls Lane (Highlands) and Evans Drive (Highlands) , Friday October 24th, 2014, 07:00 AM thru 04:30 PM, right shoulder closure, Monday October 27th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 07:00 AM thru 04:30 PM, right shoulder closureOrangeHudson Valley Catskill Area10/23/2014 6:32:22 AMConstructionNY 32
transit incidentCTY TRM Zone BrancheventMTA Long Island Rail Road: due to Elevator Malfunction CTY TRM Zone Branch at Woodside Station (Queens) Starting Wed. Oct. 1, the elevator serving Platform A (Track 4) at Woodside Station will be taken out of service for replacement. Please use stairs or ramp on 62nd St. to access eastbound platform. The work is expected to be finished by Spring 2015.QueensNew York City Area10/19/2014 2:38:09 AMTransit IncidentsCTY TRM Zone Branch
transit constructionE LineeventMTA NYC Transit Subway: due to Construction, Queens Bound E Line between W 4th Street-Washington Square Station (Manhattan) and 21st Street-Queensbridge Station (Queens) , Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday, 09:45 PM thru 05:00 AM, runs via F lineNew YorkNew York City Area10/17/2014 10:59:03 AMTransit ConstructionE Line
transit constructionR LineeventMTA NYC Transit Subway: due to Construction, both directions R Line between 59th Street Station (Manhattan) and 36th Street Station (Brooklyn) No Train Service - Take the N instead, Monday October 20th, 2014 thru Friday October 31st, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM,New YorkNew York City Area10/21/2014 11:36:11 AMTransit ConstructionR Line
constructionNY 374eventNYSDOT: reduced to one lane on NY 374 in both directions from Village of Dannemora; Town of Dannemora to Town of Plattsburgh; Town of Saranac Line due to paving operations starting 7:30 AM, 10/14/14 until 5:00 PM, 10/24/14 on weekday(s). Comment: Resurfacing Rte 374 from 1210 - 1255ClintonAdirondack Watertown Plattsburgh Area10/2/2014 8:19:10 AMConstructionNY 374
constructionNY 31eventNYSDOT: construction work on NY 31 west between Exit - Witmer Road; I-190; Niagara Thruway (Niagara) and City of Niagara Falls; Town of Niagara Line (Niagara) look out for flaggerNiagaraNiagara Buffalo Area10/23/2014 10:14:50 AMConstructionNY 31
constructionNY 17eventNYSDOT - Region 9: Construction on NY 17 both directions area of Exit 100 - NY 52 East (Liberty) alternate lanes closed for bridge painting and blasting under SR 52. Work is from 7:00 am to 7:00 pm, 9/22/14 to 11/28/14. D262488 IR 26238SullivanHudson Valley Catskill Area10/2/2014 4:06:34 PMConstructionNY 17
constructionNY 17eventNYSDOT - Region 9: Construction on NY 17 both directions between Exit 94 - Stewart Brook Road; NY 206 (Rockland) and Exit 96 - White Roe Lake Road (Rockland) alternate lanes closed on bridges over Willowemoc Creek. Work is from 7:00 am to 7:00 pm, 9/22/14 to 10/31/14. D262488 IR 26239SullivanHudson Valley Catskill Area10/2/2014 4:33:34 PMConstructionNY 17
constructionNY 43eventNYSDOT: road construction, reduced to one lane on NY 43 in both directions from North Greenbush Road; US 4 to NY 150 until 3:00 PM, 10/31/14. Comment: RTE 43 E/W between Old Best Rd (Co. RTE 53) and Brinker Dr has an Alternating single lane closure for Road Construction, in the Towns of North Greenbush, and Sand Lake.RensselaerCapital Region Albany Saratoga Area10/23/2014 1:39:59 AMConstructionNY 43
constructionNY 411eventNYSDOT: construction work on NY 411 between START ROUTE NY 411; NY 180 and I81 - Exit 49; Town of Theresa; Town of Orleans Line for the next month. Comment: Culvert repairs are being made. Traffic will be single lane controlled by flaggers during work hours.JeffersonAdirondack Watertown Plattsburgh Area10/3/2014 8:11:33 AMConstructionNY 411
constructionNY 17eventNYSDOT - Region 9: Construction on NY 17 westbound between Exit 63 - CR 54; Stunton Hill Road (Nichols) and Exit 64 - NY 96 (Owego) right shoulder closed for culvert repairs from 7:00 am to 3:30 pm, 10/6/14 to 10/31/14. D262507 IR 26246TiogaSouthern Tier Homell Elmira Binghamton Area10/3/2014 12:44:41 PMConstructionNY 17
constructionI-86eventNYSDOT: bridge construction, reduced to one lane on I-86 westbound from Exit 14 - NY 62 Frewsburg Road to Exit 15 - Schoolhouse Road starting 7:30:00 AM, 10/3/2014 until further notice. Comment: I-86 over Grubb Hill RoadChautauquaNiagara Buffalo Area10/17/2014 3:12:03 PMConstructionI-86
constructionNY 265eventNYSDOT: construction work, right lane closed on NY 265 southbound from Packard Road; NY 182 to City of Niagara Falls; Town of Niagara Line starting 7:11:00 AM, 10/6/2014 until further notice. Comment: Right lane closure at factory outlet mall north entrance.NiagaraNiagara Buffalo Area10/16/2014 11:54:03 AMConstructionNY 265
closure constructionI-190 - Niagara ThruwayeventNYSDOT: closures on I-190 - Niagara Thruway both directions at Exit N21 (I-190) - Robert Moses Parkway (Rte 384) (Niagara Falls) exit ramp closed until 7:00 P.M. Friday, October 31, 2014. Comment: I-190 exit ramps to Buffalo Avenue will be closed. Northbound I-190 exit ramp to Robert Moses Parkway will remain open.NiagaraNiagara Buffalo Area10/6/2014 6:49:05 AMClosure ConstructionI-190 - Niagara Thruway
constructionWest PerimetereventNYSDOT: construction work, single line traffic alternating directions, temporary traffic lights on West Perimeter in both directions from START ROUTE West Perimeter; at Pennsylvania State Line to Town of Cold Spring; Town of South Valley Line starting 7:00:00 AM, 10/6/2014 until further notice on weekday(s) and Saturday(s).CattaraugusNiagara Buffalo Area10/23/2014 8:10:12 AMConstructionWest Perimeter
transit construction# 2 LineeventMTA NYC Transit Subway: due to Construction, southbound # 2 Line bypassing Bergen Street Station (Brooklyn) , Grand Army Plaza and Eastern Parkway, Monday October 6th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM,KingsNew York City Area10/6/2014 2:06:02 PMTransit Construction# 2 Line
transit construction# 4 LineeventMTA NYC Transit Subway: due to Construction, Brooklyn Bound # 4 Line bypassing Bergen Street Station (Brooklyn) , Grand Army Plaza and Eastern Pkwy, Monday October 6th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 11:45 PM thru 05:00 AM,KingsNew York City Area10/6/2014 2:13:30 PMTransit Construction# 4 Line
transit constructionA LineeventMTA NYC Transit Subway: due to Construction, southbound A Line bypassing 116th Street Station (Manhattan) , 110, 103, 96, 86, 81 and 72 Sts Stations, Monday October 6th, 2014 thru Friday October 31st, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM,New YorkNew York City Area10/6/2014 2:16:25 PMTransit ConstructionA Line
constructionLincoln TunneleventPort Authority NY/NJ: Construction on Lincoln Tunnel eastbound west of New Jersey Side - Toll Plaza, Monday October 20th, 2014 thru Friday October 24th, 2014, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AMHudsonNew Jersey10/20/2014 9:07:51 AMConstructionLincoln Tunnel
constructionLincoln TunneleventPort Authority NY/NJ: construction on Lincoln Tunnel westbound west of New Jersey Side - North Tube (Weehawken Twp) outbound helix crossover counter flow setup, Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 06:00 AM,HudsonNew Jersey10/21/2014 11:10:27 AMConstructionLincoln Tunnel
transit incidentBabylon BrancheventMTA Long Island Rail Road: due to Escalator Malfunction Babylon Branch at Massapequa Station (Nassau County) In underpass at east end, from street level to platform is out of service until further noticeNassauLong Island Area10/23/2014 10:45:38 AMTransit IncidentsBabylon Branch
transit construction# 2 LineeventMTA NYC Transit Subway: due to Construction, northbound # 2 Line between Chambers Street Station (Manhattan) and 34th Street-Penn Station (Manhattan) , Tuesday October 14th, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 12:01 AM thru 05:00 AM, local service onlyNew YorkNew York City Area10/7/2014 1:32:38 PMTransit Construction# 2 Line
transit constructionL LineeventMTA NYC Transit Subway: due to Construction, both directions L Line between 8th Avenue Station (Manhattan) and Rockaway Parkway-Canarsie Station (Brooklyn) trains run in two sections with a transfer at Broadway Junction, Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 11:00 AM thru 03:00 PM,New YorkNew York City Area10/20/2014 10:10:25 AMTransit ConstructionL Line
transit constructionL LineeventMTA NYC Transit Subway: due to Construction, both directions L Line between Broadway-Eastern Parkway Station (Brooklyn) and Rockaway Parkway-Canarsie Station (Brooklyn) trains run every 24 minutes, Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 11:00 AM thru 03:00 PM,KingsNew York City Area10/20/2014 10:11:00 AMTransit ConstructionL Line
constructionNewburgh Beacon BridgeeventNYS Bridge Authority: longterm construction on Newburgh Beacon Bridge eastbound Dutchess County Bound (Newburgh/Beacon) , Continuous Tuesday October 7th, 2014 12:00 AM thru Wednesday October 7th, 2015 11:59 PM 2 left lanes of 4 lanes closedOrange/DutchessHudson Valley Catskill Area10/7/2014 5:02:00 PMConstructionNewburgh Beacon Bridge
constructionNewburgh Beacon BridgeeventNYS Bridge Authority: Construction, longterm construction on Newburgh Beacon Bridge eastbound Dutchess County Bound (Newburgh/Beacon) 2 left lanes of 4 lanes closed until 11:59 P.M. on October 07, 2015Orange/DutchessHudson Valley Catskill Area10/7/2014 4:54:57 PMConstructionNewburgh Beacon Bridge
general infoBrooklyn Battery TunneleventMTA Bridges & Tunnels: Security Check Point on Brooklyn Battery Tunnel both directions Manhattan/Brooklyn Bound (Manhattan/Brooklyn) Placarded vehicles and tanker trucks banned. All vehicles are subject to inspection.New York/KingsNew York City Area10/19/2014 10:06:08 AMGeneral InformationBrooklyn Battery Tunnel
general infoQueens Midtown TunneleventMTA Bridges & Tunnels: Security Check Point on Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) Placarded vehicles and tanker trucks banned. All vehicles are subject to inspection.New York/QueensNew York City Area10/19/2014 10:05:34 AMGeneral InformationQueens Midtown Tunnel
constructionNY 38eventNYSDOT - Region 9: Roadwork, roadwork on NY 38 both directions Town of Berkshire; Town of Newark Valley Line (Berkshire) to Town of Richford; Town of Berkshire Line (Berkshire) alternate lanes closed for culvert rehabilitation, between Lawrence and Marean roads, from 7am to 3:30pm daily thru 10/31/14, weather dependent IR#26273TiogaSouthern Tier Homell Elmira Binghamton Area10/8/2014 8:58:25 AMConstructionNY 38
closure constructionI-690eventNYSDOT - Region 3: bridge work on I-690 eastbound at Exit 9 - NY 298; Bear Street (Syracuse) , Thursday October 23rd, 2014, 09:00 AM thru 01:00 PM, exit ramp closedOnondagaCentral Syracuse Utica Area10/8/2014 1:40:50 PMClosure ConstructionI-690
closure constructionFort Washington AvenueeventNYSDOT - Region 11: crane operations on Fort Washington Avenue between West 178th Street (New York) and West 179th Street , Monday October 13th, 2014 thru Friday October 24th, 2014, Sunday thru Saturday, 01:00 AM thru 05:00 AM, all lanes closedNew YorkNew York City Area10/8/2014 5:09:06 PMClosure ConstructionFort Washington Avenue
closure constructionRobert Moses State ParkwayeventNYSDOT: exit ramp closed, bridge construction on Robert Moses State Parkway northbound at Ridge Road; Ramp -- follow detour signs starting 7:00:00 PM, 10/9/2014 until further notice. Comment: Ramp to route 104 westbound and route 18F northbound is closed.NiagaraNiagara Buffalo Area10/16/2014 12:49:50 PMClosure ConstructionRobert Moses State Parkway
constructionNY 5eventNYSDOT - Region 3: roadwork on NY 5 both directions from Route 695 (Camillus) to Newport Road (Camillus) , Wednesday October 22nd, 2014 thru Friday October 24th, 2014 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, alternate lanes closedOnondagaCentral Syracuse Utica Area10/9/2014 7:50:09 PMConstructionNY 5
constructionNY 31eventNYSDOT: road maintenance operations, reduced to one lane on NY 31 in both directions from Town of Cambria; Town of Lockport Line; Campbell Boulevard; NY 270; Lockport Junction Road to West Avenue; NY 31 starting 8:08 AM, 10/22/14 until 3:00 PM, 10/24/14 on weekday(s).NiagaraNiagara Buffalo Area10/16/2014 2:39:07 PMConstructionNY 31
constructionNY 242eventNYSDOT: construction work, single line traffic alternating directions on NY 242 in both directions from Town of Mansfield; Town of Ellicottville Line to US 219 North due to temporary traffic lights starting 8:00:00 AM, 10/10/2014 until further notice on weekday(s). Comment: workzone is between Bibbs Road and Fillmore Drive. Only shoulder closures will remain during non-working hours.CattaraugusNiagara Buffalo Area10/23/2014 11:34:06 AMConstructionNY 242
constructionNY 242eventNYSDOT: construction work, right shoulder closed on NY 242 in both directions from Town of Mansfield; Town of Ellicottville Line to Holhilton starting 8:01:00 AM, 10/10/2014 until further notice. Comment: Shoulder closure during non-working hours between Bibbs Rd and Fillmore DrCattaraugusNiagara Buffalo Area10/23/2014 11:34:27 AMConstructionNY 242
constructionNY 34eventNYSDOT - Region 3: bridge work on NY 34 both directions area of Town of Newfield; Town of Danby Line (Newfield) from Piper Rd to McDaniels Rd reduced to one lane with temporary traffic signals, Tuesday October 21st, 2014 thru Friday October 31st, 2014, Sunday thru Saturday, 08:00 AM thru 03:00 PM,TompkinsSouthern Tier Homell Elmira Binghamton Area10/10/2014 3:07:34 PMConstructionNY 34
constructionNY 12eventNYSDOT - Region 2: roadwork on NY 12 southbound south of Court Street (Utica) , Continuous Friday October 10th, 2014 12:00 AM thru Friday October 31st, 2014 11:59 PM lane closedOneidaCentral Syracuse Utica Area10/10/2014 3:41:35 PMConstructionNY 12
constructionNY 12eventNYSDOT - Region 2: Construction, roadwork on NY 12 southbound south of Court Street (Utica) lane closed until 11:59 P.M. on October 31, 2014OneidaCentral Syracuse Utica Area10/10/2014 3:41:45 PMConstructionNY 12
constructionNY 30AeventNYSDOT - Region 2: culvert repairs on NY 30A northbound north of NY 162 (Esperance) at multiple sites, Monday October 13th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 06:00 AM thru 06:30 PM,SchoharieCapital Region Albany Saratoga Area10/15/2014 2:08:42 PMConstructionNY 30A
constructionNY 13eventNYSDOT - Region 2: culvert repairs on NY 13 both directions between Corwin Street (Cazenovia) and Town of Cazenovia; Town of Fenner Line (Fenner) between US 20 and Maple Road. Temporary signal, Continuous Friday October 10th, 2014 4:10 AM thru Friday October 31st, 2014 6:00 PM laneMadisonCentral Syracuse Utica Area10/10/2014 4:07:45 PMConstructionNY 13
constructionGeorge Washington BridgeeventPort Authority NY/NJ: construction on George Washington Bridge eastbound New York Side/Upper Level (Manhattan) upper level expressway, Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, 1 left lane open, Sunday October 26th, 2014, 12:01 AM thru 08:00 AM, 1 right lane open, Saturday October 25th, 2014, 12:01 AM thru 08:00 AM, 1 left lane openNew YorkNew York City Area10/18/2014 8:01:04 AMConstructionGeorge Washington Bridge
closure constructionBayonne BridgeeventPort Authority NY/NJ: construction on Bayonne Bridge both directions between New Jersey Side (Bayonne) and New York Side (Staten Island) , Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, all lanes closed, Friday October 24th, 2014 thru Saturday October 25th, 2014, 11:59 PM thru 08:00 AM, all lanes closedHudsonNew Jersey10/18/2014 8:01:05 AMClosure ConstructionBayonne Bridge
closure constructionRobert Moses State ParkwayeventNYSDOT: bridge construction on Robert Moses State Parkway north at Ridge Road; Ramp (Lewiston) exit ramp closed follow detour signs . Comment: Ramp from Robert Moses Parkway Northbound to NY104 is open. Robert Moses Northbound slip ramp to NY104 WB / Route 18F Northbound is closed.NiagaraNiagara Buffalo Area10/10/2014 6:45:22 PMClosure ConstructionRobert Moses State Parkway
constructionNY 86eventNYSDOT: road construction, reduced to one lane on NY 86 in both directions from Sentinel Road; NY 73 to Town of Harrietstown; Village of Saranac starting 7:00 AM, 10/14/14 until 3:30 PM, 10/24/14. Comment: RTE 86 E/W has a single lane closure (Both Directions) with Flaggers between Main St (Lake Placid) and Broadway St (Saranac Lake) for Guide Rail repair.EssexAdirondack Watertown Plattsburgh Area10/11/2014 1:08:18 AMConstructionNY 86
transit constructionA LineeventMTA NYC Transit Subway: due to Construction, Construction, Manhattan Bound A Line bypassing 88th Street Station (Queens) until 11:59 P.M. on January 06, 2015QueensNew York City Area10/13/2014 5:00:29 AMTransit ConstructionA Line
constructionNY 17eventNYSDOT - Region 8: roadwork on NY 17 eastbound between Exit 121E - I 84 (Wallkill) and Exit 122 - CR 67 (Wallkill) , Thursday October 23rd, 2014 thru Friday October 24th, 2014 Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday October 27th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closuresOrangeHudson Valley Catskill Area10/22/2014 6:27:44 AMConstructionNY 17
closure constructionI-690eventNYSDOT - Region 3: Construction, bridge replacement on I-690 eastbound Exit 14 - Teall Avenue (Syracuse) exit ramp closed until 3:00 P.M. on October 31, 2014OnondagaCentral Syracuse Utica Area10/14/2014 7:08:45 PMClosure ConstructionI-690
constructionI-190eventNYSDOT: construction work, right lane closed on I-190 northbound from Witmer Road; NY 31 to Exit 25A - NY 265 Military Road until 7:00 PM, 10/24/14 on Saturday(s).NiagaraNiagara Buffalo Area10/16/2014 11:48:00 AMConstructionI-190
transit construction# 6 LineeventMTA NYC Transit Subway: due to Construction, southbound # 6 Line bypassing Longwood Avenue Station (Bronx) , E 149 St, E 143 St, Cypress Av and Brook Av Stations, Tuesday October 14th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 11:45 PM thru 05:00 AM,BronxNew York City Area10/14/2014 10:49:51 AMTransit Construction# 6 Line
constructionI-86eventNYSDOT: construction work on I-86 eastbound at Exit 36 - I-390 North; Ramp due to reduced to one lane starting 7:00 AM, 10/15/14 until 6:00 PM, 11/05/14. Comment: Bridge painting. Single lane traffic 24 hrs. per day for 3 weeks.SteubenSouthern Tier Homell Elmira Binghamton Area10/14/2014 1:02:51 PMConstructionI-86
transit constructionD LineeventMTA NYC Transit Subway: due to Construction, Bronx Bound D Line from 145th Street Station (Manhattan) to Tremont Avenue Station (Bronx) , Monday October 20th, 2014 thru Friday October 31st, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 10:45 PM thru 05:00 AM, express only, Continuous Friday October 24th, 2014 10:45 PM thru Monday October 27th, 2014 5:00 AM , express onlyNew YorkNew York City Area10/21/2014 11:02:11 AMTransit ConstructionD Line
transit constructionG LineeventMTA NYC Transit Subway: due to Construction, both directions G Line between Church Avenue Station (Brooklyn) and Hoyt-Schermerhorn Station (Brooklyn) No train service - take the A or F trains instead, Monday October 20th, 2014 thru Friday October 31st, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:30 PM thru 05:00 AM,KingsNew York City Area10/21/2014 11:25:37 AMTransit ConstructionG Line
constructionNY 17eventNYSDOT - Region 9: Roadwork on NY 17 both directions between Exit 63 - CR 54; Stunton Hill Road (Nichols) and Town of Owego; Town of Vestal Line (Owego) left lane blocked at various locations, for guiderail repairs, 7:30am to 3pm, 10/15 thru 10/21. IR#26318TiogaSouthern Tier Homell Elmira Binghamton Area10/15/2014 7:32:21 AMConstructionNY 17
constructionNY 12eventNYSDOT - Region 2: bridge work on NY 12 both directions at NY 28; off-ramp (Boonville) Lane closures and intermittent road closure with onsite detour., Thursday October 16th, 2014 thru Friday October 31st, 2014, Monday thru Friday, 06:30 AM thru 06:00 PM,OneidaCentral Syracuse Utica Area10/15/2014 1:44:25 PMConstructionNY 12
constructionNY 46eventNYSDOT - Region 2: utility work on NY 46 both directions between NY 31; State Bridge (Verona) and East Dominick Street; Ramp (Rome) Navigation lighting work on NY 46 over Canal., Friday October 17th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 06:00 AM thru 06:30 PM, lane closureOneidaCentral Syracuse Utica Area10/15/2014 2:04:57 PMConstructionNY 46
constructionNY 13eventNYSDOT - Region 2: Construction, culvert repairs on NY 13 both directions between Corwin Street (Cazenovia) and Town of Cazenovia; Town of Fenner Line (Fenner) lane until 6:00 P.M. on October 31, 2014 between US 20 and Maple Road. Temporary signalMadisonCentral Syracuse Utica Area10/15/2014 2:07:35 PMConstructionNY 13
transit incidentCTY TRM Zone BrancheventMTA Long Island Rail Road: due to Elevator Malfunction CTY TRM Zone Branch at Flatbush Avenue Station (Brooklyn) #1, West end platforms, adjacent to MTA Police. Between platform/street levels on Hanson Place is out of service until further notice.KingsNew York City Area10/23/2014 10:47:17 AMTransit IncidentsCTY TRM Zone Branch
constructionI-787eventNYSDOT: road construction, right lane closed on I-787 northbound at Exit 6; NY 32; Wards Lane starting 7:00 PM, 10/19/14 until 8:00 PM, 10/23/14. Comment: I-787 NB at Exit 6 (Wards Lane Bridge) has the Right lane CLOSED for Bridge Work.AlbanyCapital Region Albany Saratoga Area10/16/2014 1:46:47 AMConstructionI-787
constructionNY 7eventNYSDOT: road construction, right lane closed on NY 7 westbound from Exit to I-787; Exit to NY 787 to Town of Green Island; Town of Colonie Line starting 9:00 AM, 10/22/14 until 4:00 PM, 10/23/14 on Wednesday(s) and Thursday(s). Comment: RTE 7 WB between Hudson Ave and I-787 has the Right lane CLOSED for Bridge inspection, in the Town of Green Island.AlbanyCapital Region Albany Saratoga Area10/16/2014 3:48:11 AMConstructionNY 7
transit incidentBabylon BrancheventMTA Long Island Rail Road: due to Elevator Malfunction Babylon Branch at Massapequa Station (Nassau County) Attached to east end of station building, between street level and platform is out of service until further noticeNassauLong Island Area10/23/2014 10:48:01 AMTransit IncidentsBabylon Branch
constructionChenango StreeteventNYSDOT - Region 9: Construction on Chenango Street both directions area of START ROUTE Chenango Street (Dickinson) alternate lanes closed at the intersection of Chenango/Grant/Phelps Streets. 7:00 am to 3:30 pm, 10/16/14 to 10/31/14. D262190 IR 26328FranklinAdirondack Watertown Plattsburgh Area10/16/2014 11:23:10 AMConstructionChenango Street
constructionI-86eventNYSDOT: road maintenance operations, reduced to one lane on I-86 westbound from Exit 8 - NY 394 West Lake Road to START ROUTE I-86; Pennsylvania State Line starting 8:30 AM, 10/20/14 until 3:30 PM, 10/24/14 on weekday(s).ChautauquaNiagara Buffalo Area10/16/2014 12:15:02 PMConstructionI-86
constructionNY 198eventNYSDOT: road maintenance operations, left lane closed on NY 198 in both directions at Grant Street; Ramp starting 9:00 AM, 10/23/14 until 3:00 PM, 10/24/14 on weekday(s).ErieNiagara Buffalo Area10/16/2014 12:39:03 PMConstructionNY 198
constructionI-190eventNYSDOT: bridge construction, reduced to one lane on I-190 southbound from Exit 21A - LaSalle Expressway to Robert Moses State Parkway starting 9:00 AM, 10/20/14 until 3:00 PM, 10/25/14 on weekday(s) and Saturday(s).NiagaraNiagara Buffalo Area10/16/2014 12:45:15 PMConstructionI-190
constructionNY 262eventNYSDOT: opposing traffic on NY 262 from South Main Street; Oak Orchard Road NY 98 to Transit Road; Town of Elba; Town of Byron Line; CR 42 starting 3:23:00 PM, 10/16/2014 until further notice.GeneseeNiagara Buffalo Area10/16/2014 3:27:24 PMConstructionNY 262
constructionCross Island ParkwayeventNYSDOT - Region 11: construction on Cross Island Parkway both directions under Exit 31 - Northern Boulevard (New York) to facilitate NYCDEP water main work., Thursday October 16th, 2014 thru Saturday November 15th, 2014, Monday thru Friday, 10:00 AM thru 03:00 PM, 1 lane closed, Thursday October 16th, 2014 thru Saturday November 15th, 2014, Monday thru Friday, 10:00 AM thru 03:00 PM, right shoulder closedQueensNew York City Area10/16/2014 3:55:49 PMConstructionCross Island Parkway
transit construction# 2 LineeventMTA NYC Transit Subway: due to Construction, Brooklyn Bound # 2 Line between 241st Street-Wakefield Station (Bronx) and Gun Hill Road Station (Bronx) , Monday October 20th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 10:15 AM thru 03:00 PM, express onlyBronxNew York City Area10/17/2014 11:18:55 AMTransit Construction# 2 Line
transit construction# 3 LineeventMTA NYC Transit Subway: due to Construction, both directions # 3 Line between 148th Street-Harlem Station (Manhattan) and New Lots Avenue Station (Brooklyn) No Train service - take the # 2 and free shuttle buses, Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM,New YorkNew York City Area10/17/2014 11:20:21 AMTransit Construction# 3 Line
transit construction# 4 LineeventMTA NYC Transit Subway: due to Construction, Brooklyn Bound # 4 Line between Mosholu Parkway Station (Bronx) and Burnside Avenue Station (Bronx) , Monday October 20th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 10:45 AM thru 03:00 PM, express onlyBronxNew York City Area10/17/2014 11:21:32 AMTransit Construction# 4 Line
transit construction# 6 LineeventMTA NYC Transit Subway: due to Construction, southbound # 6 Line Hunts Point Avenue Station (Bronx) to 3rd Avenue-138th Street Station (Bronx) , Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM, express only, Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Thursday/ Friday, 10:15 AM thru 01:00 PM, local service onlyBronxNew York City Area10/20/2014 10:08:38 AMTransit Construction# 6 Line
transit construction# 6 LineeventMTA NYC Transit Subway: due to Construction, Manhattan Bound # 6 Line between Parkchester-E 177th Street Station (Bronx) and Hunts Point Avenue Station (Bronx) , Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Thursday/ Friday, 10:15 AM thru 03:00 PM, express onlyBronxNew York City Area10/20/2014 10:07:14 AMTransit Construction# 6 Line
constructionNY 146eventNYSDOT: road construction, right shoulder closed on NY 146 in both directions from Glenridge Road; Blue Barns Road to Vischer Ferry Road; NY 146A; CR 90 starting 9:00 AM, 10/20/14 until 3:00 PM, 10/24/14 on weekday(s). Comment: RTE 146 Eastbound and Westbound between RTE 146A and Blue Barns Rd the right shoulder will be closed due to stripingSaratogaCapital Region Albany Saratoga Area10/17/2014 11:22:17 AMConstructionNY 146
transit constructionA LineeventMTA NYC Transit Subway: due to Construction, Queens Bound A Line between 125th Street Station (Manhattan) and 59th Street-Columbus Cir Station (Manhattan) , Monday October 20th, 2014 thru Friday October 31st, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM, express onlyNew YorkNew York City Area10/20/2014 6:35:59 PMTransit ConstructionA Line
transit constructionA LineeventMTA NYC Transit Subway: due to Construction, both directions A Line between 207th Street-Inwood Station (Manhattan) and Lefferts Boulevard/Far Rockaway Stations (Queens) trains operate in two sections with a transfer at 168th St and run every 30 minutes from 207th to 168th Sts., Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 12:01 AM thru 05:00 AM,New YorkNew York City Area10/17/2014 11:41:54 AMTransit ConstructionA Line
transit constructionB LineeventMTA NYC Transit Subway: due to Construction, northbound B Line from Sheepshead Bay Station (Brooklyn) to Prospect Park Station (Brooklyn) , Wednesday October 22nd, 2014 thru Friday October 24th, 2014 Wednesday/ Thursday/ Friday, 09:45 AM thru 03:00 PM, local service onlyKingsNew York City Area10/17/2014 11:43:19 AMTransit ConstructionB Line
transit constructionE LineeventMTA NYC Transit Subway: due to Construction, Manhattan Bound E Line between Jamaica-Van Wyck Station (Queens) and Forest Hills-71st Avenue Station (Queens) bypasses Van Wyck Blvd and 75th Av Stations, Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday, 09:45 PM thru 05:00 AM,QueensNew York City Area10/17/2014 11:49:31 AMTransit ConstructionE Line
transit constructionE LineeventMTA NYC Transit Subway: due to Construction, Manhattan Bound E Line between Forest Hills-71st Avenue Station (Queens) and Jackson Hts-Roosevelt Avenue Station (Queens) , Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, express onlyQueensNew York City Area10/17/2014 11:51:12 AMTransit ConstructionE Line
transit constructionF LineeventMTA NYC Transit Subway: due to Construction, Queens Bound F Line between 4th Avenue Station (Brooklyn) and Jay Street-Metro Tech Station (Brooklyn) bypasses Smith-9th Street, Carroll Street, and Bergen Street Stations, Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:45 PM thru 05:00 AM,KingsNew York City Area10/17/2014 11:53:40 AMTransit ConstructionF Line
transit constructionF LineeventMTA NYC Transit Subway: due to Construction, Brooklyn Bound F Line between Parsons Boulevard Station (Queens) and Forest Hills-71st Avenue Station (Queens) bypasses Sutphin Blvd, Van Wyck Blvd, and 75th Av Stations, Tuesday October 21st, 2014 thru Friday October 24th, 2014 Tuesday/ Wednesday/ Thursday, 09:45 PM thru 05:00 AM,QueensNew York City Area10/17/2014 11:54:57 AMTransit ConstructionF Line
transit constructionF LineeventMTA NYC Transit Subway: due to Construction, Queens Bound F Line from 21st Street-Queensbridge Station (Queens) to Jackson Hts-Roosevelt Avenue Station (Queens) , Wednesday October 22nd, 2014 thru Friday October 24th, 2014 Wednesday/ Thursday/ Friday, 12:30 AM thru 05:00 AM, local service onlyQueensNew York City Area10/17/2014 11:56:13 AMTransit ConstructionF Line
transit constructionG LineeventMTA NYC Transit Subway: due to Construction, both directions G Line between Hoyt-Schermerhorn Station (Brooklyn) and Bedford-Nostrand Avs Station (Brooklyn) trains run every 20 minutes, Monday October 20th, 2014 thru Friday October 24th, 2014 Monday/ Tuesday/ Wednesday/ Thursday, 11:30 PM thru 05:00 AM,KingsNew York City Area10/17/2014 11:58:28 AMTransit ConstructionG Line
transit constructionN LineeventMTA NYC Transit Subway: due to Construction, southbound N Line between 36th Street Station (Brooklyn) and Coney Island-Stillwell Avenue Station (Brooklyn) , Thursday October 23rd, 2014 thru Friday October 24th, 2014 Thursday/ Friday, 09:45 AM thru 03:00 PM, runs via D line, Monday October 27th, 2014 thru Wednesday October 29th, 2014 Monday/ Tuesday/ Wednesday, 09:45 AM thru 03:00 PM, runs via D lineKingsNew York City Area10/21/2014 12:18:18 PMTransit ConstructionN Line
transit constructionQ LineeventMTA NYC Transit Subway: due to Construction, Brooklyn Bound Q Line between Prospect Park Station (Brooklyn) and Sheepshead Bay Station (Brooklyn) , Wednesday October 22nd, 2014 thru Friday October 24th, 2014 Wednesday/ Thursday/ Friday, 09:45 AM thru 03:00 PM, express onlyKingsNew York City Area10/17/2014 12:01:51 PMTransit ConstructionQ Line
transit constructionR LineeventMTA NYC Transit Subway: due to Construction, Brooklyn Bound R Line between Forest Hills-71st Avenue Station (Queens) and Jackson Hts-Roosevelt Avenue Station (Queens) , Tuesday October 21st, 2014 thru Thursday October 23rd, 2014 Tuesday/ Wednesday/ Thursday, 09:45 PM thru 11:00 PM, express onlyQueensNew York City Area10/17/2014 12:03:26 PMTransit ConstructionR Line
constructionNY 33eventNYSDOT: bridge maintenance operations, left lane closed on NY 33 westbound from Northampton Street to East Ferry Street starting 12:00 PM, 10/22/14 until 3:00 PM, 10/23/14 on weekday(s). Comment: Workzone is between East Utica Street and East Ferry Street.ErieNiagara Buffalo Area10/17/2014 12:53:55 PMConstructionNY 33
constructionI-787eventNYSDOT: road construction, right lane closed on I-787 southbound from Exit 2; NY 32; South Pearl Street; Port of Albany to Exit 1 southbound ramp to I-87 Thruway Interchange 23 starting 12:00 AM, 10/20/14 until 12:00 AM, 10/25/14 on weekday(s). Comment: I-787 Southbound between Exit 2 and Exit 1 the right lane will be closed due to reconstructionAlbanyCapital Region Albany Saratoga Area10/17/2014 12:04:57 PMConstructionI-787
constructionNY 5eventNYSDOT: road construction on NY 5 from Auburn City Line; Town of Sennett to Cayuga-Onondaga County Line until 6:00 PM, 10/31/14 on weekday(s). Comment: Roadwork on Route 5 from the RR tracks to the Onondaga County line. Milling and paving operations. Traffic control with one lane alternating traffic. MInor delays expected.CayugaFinger Lakes Rochester Area10/17/2014 12:22:24 PMConstructionNY 5
constructionNY 85eventNYSDOT: bridge construction, reduced to one lane on NY 85 eastbound at Exit to US 20 via Cortland Street until 3:00 PM, 10/24/14.AlbanyCapital Region Albany Saratoga Area10/17/2014 2:26:01 PMConstructionNY 85
closure constructionNY 85eventNYSDOT: bridge construction, entrance ramp closed on NY 85 westbound at Exit to State Office Campus until 3:00 PM, 10/31/14. Comment: The ramp from Belvidere Ave to Rte 85 westbound will be closed 24 hours a day due to bridge work.Follow posted detourAlbanyCapital Region Albany Saratoga Area10/17/2014 2:28:24 PMClosure ConstructionNY 85
constructionI-88eventNYSDOT: road construction, right lane closed on I-88 eastbound from Town of Schoharie; Town of Duanesburg Line; Schenectady-Schoharie County Line to Exit 24; US 20; NY 7 starting 6:00 AM, 10/21/14 until 6:00 PM, 10/24/14 on Tuesday(s), Wednesday(s), Thursday(s) and Friday(s). Comment: I-88 Eastbound between Exit 24 and Normanskill Bridge the right lane will be closed due to pavement maintenanceSchenectadyCapital Region Albany Saratoga Area10/17/2014 2:35:15 PMConstructionI-88
constructionGeorge Washington BridgeeventPort Authority NY/NJ: bridge work on George Washington Bridge westbound between New York Side/Lower Level (Manhattan) and New Jersey Side/Lower Level (Fort Lee) , Monday October 20th, 2014 thru Friday October 24th, 2014, Monday thru Friday, 08:30 AM thru 02:30 PM, left lane closedNew YorkNew York City Area10/17/2014 2:59:56 PMConstructionGeorge Washington Bridge
constructionGeorge Washington BridgeeventPort Authority NY/NJ: bridge work on George Washington Bridge westbound between New York Side/Upper Le