
 |  |  Fort Drum Memorial Drive
|  |  NYSDOT: major road construction on Fort Drum Memorial Drive at US 11. starting 8:50 AM, 07/22/10 until further notice. Comment: This is the construction of the future I-781, Fort Drum Connector , between Fort Drum and I-81. There may be daily lane closures controlled by flaggers on Routes 11 and 37.
Last update: 7/22/2010 8:52:42 AM
|
| |

 |  |  I-81
|  |  NYSDOT: reduced to one lane on I-81 in both directions from Exit 41; NY 178; West Church Street to Exit 42; NY 177 Ramp due to bridge construction starting 7:00 AM, 08/02/10 until further notice. Comment: Work is underway on the bridge carrying Michael Rd. over I-81.
Last update: 7/27/2010 3:26:50 PM
|
| |

 |  |  I-87 Northway
|  |  NYSDOT: bridge construction, right lane closed on I-87 Northway southbound at Exit 24 - Riverbank. starting 12:00 PM, 04/29/10 until further notice. Comment: This area is reduced to one lane in each direction. There is a lane shift in place for the southbound traffic.
Last update: 6/1/2010 10:33:08 AM
|
| |

 |  |  I-87 Northway
|  |  NYSDOT: road construction, reduced to one lane on I-87 Northway in both directions at Exit 32 -Garvey Mill Road starting 7:00 AM, 03/31/10 until 5:00 PM, 11/01/10. Comment: I-87 north from exit 32 to 3 miles north of exit 32 there will be a left lane closure, southbound there will be a right lane closure in the same location.
Last update: 3/29/2010 8:20:41 AM
|
| |

 |  |  I-87 Northway
|  |  NYSDOT: right shoulder closed on I-87 Northway southbound from City of Plattsburgh; Town of Plattsburgh Line to Exit 38B - NY 22; Route 374 due to bridge maintenance operations. starting 2:22 PM, 07/07/09 until further notice. Comment: Shoulder closed for bridge repair.
Last update: 7/7/2009 2:30:06 PM
|
| |

 |  |  I-87 Northway
|  |  NYSDOT: bridge construction on I-87 Northway from Exit 35 - NY 442 Ramp to Bear Swamp Road; NY 442. starting 9:07 AM, 08/17/10 until further notice. Comment: The bridges carrying Rt. 442 (Bear Swamp Rd.) over I-87 are being replaced.
Last update: 8/17/2010 9:09:01 AM
|
| |

 |  |  I-87 Northway
|  |  NYSDOT: bridge construction on I-87 Northway from NY 22 to Exit 35 - NY 442 Ramp. starting 2:30 PM, 08/03/10 until further notice. Comment: The bridge carrying CR 38 (Arthur Rd) over I-87 is being replaced. CR 38 has been restricted to one lane , 12 feet wide, with traffic controlled by temporary traffic signals.
Last update: 8/17/2010 9:06:41 AM
|
| |

 |  |  I-87 Northway
|  |  NYSDOT: bridge construction on I-87 Northway in both directions from Exit 37 - I-87 (Exit 37) connector to NY 3 to Exit 38A - NY 22 until 9:00 AM, 11/30/10. Comment: The bridge carrying CR 26 ( Tom Miller Road) over I-87 is being replaced. Motorists on I-87 will need to be aware of activity in the area between Exits 37 and 38 and speed is reduced to 55 MPH.
Last update: 4/7/2010 9:59:41 AM
|
| |

 |  |  NY 12
|  |  NYSDOT: paving operations on NY 12 from NY 342 to NY 180 for the next two weeks. starting 8:00 AM, 08/30/10 until 8:00 AM, 09/13/10.
Last update: 8/30/2010 8:00:02 AM
|
| |

 |  |  NY 126
|  |  NYSDOT: paving operations on NY 126 from State Street; NY 12; START ROUTE NY 126 to Town of Rutland; Town of Champion Line. starting 12:52 PM, 08/30/10 until further notice. Comment: Paving will begin Sept 7 thru approx. Sept 9.
Last update: 8/30/2010 1:05:42 PM
|
| |

 |  |  NY 185
|  |  NYSDOT: closed to traffic on NY 185 in both directions from Crown Point Bridge to Vermont State Line. starting 1:35 PM, 10/16/09 until further notice. Comment: See: More Info. The free Lake Champlain Ferry Service to Vermont is now available at Crown Point. The ferry operates 24 hours a day, year round, with several daily scheduled crossings. Motorists access the ferry from a service road off of the east end of Bridge Road (NY Route 185).
Last update: 2/26/2010 1:19:54 PM
|
| |

 |  |  NY 185
|  |  NYSDOT: road construction, single line traffic alternating directions on NY 185 in both directions at NY 9N starting 12:00 AM, 08/29/10 until 12:00 PM, 09/04/10.
Last update: 8/27/2010 2:53:44 PM
|
| |

 |  |  NY 190
|  |  NYSDOT: reduced to one lane on NY 190 in both directions from Franklin; Clinton County Line to Town of Ellenburg; Town of Altona Line due to paving operations starting 7:00 AM, 08/31/10 until further notice on weekdays. Comment: Road paving. One lane closed.
Last update: 7/13/2010 11:23:56 AM
|
| |

 |  |  NY 22
|  |  NYSDOT: road construction, single line traffic alternating directions on NY 22 in both directions from Town of Willsboro; Town of Essex Line to Essex-Washington County Line. starting 6:30 AM, 08/16/10 until further notice. Comment: This roadwork will be on Rte 22 in the area of Reber Rd North.
Last update: 9/2/2010 9:48:33 AM
|
| |

 |  |  NY 26
|  |  NYSDOT: paving operations on NY 26 from Village of Theresa; Town of Theresa to NY 411; Start of NY 37 Overlap due to paving operations for the next two weeks. starting 12:43 PM, 08/30/10 until 12:43 PM, 09/13/10. Comment: Milling operations will begin sept 7. Paving will begin sept 10.
Last update: 8/30/2010 12:47:05 PM
|
| |

 |  |  NY 28
|  |  NYSDOT: construction work on NY 28 from Herkimer; Oneida County Line to McKeever Road starting 7:00 AM, 07/26/10 until 3:30 PM, 10/28/10. Comment: Shoulder closures NB & SB between McKeever Station Rd and County Route 84 due to culvert repairs.
Last update: 7/22/2010 3:08:21 PM
|
| |

 |  |  NY 3
|  |  NYSDOT: reduced to one lane on NY 3 in both directions from Franklin County; Clinton County Line to Town of Plattsburgh; Town of Saranac Line due to road maintenance operations. starting 7:00 AM, 07/17/10 until further notice. Comment: Resurfacing pavement. One lane closed.
Last update: 8/12/2010 3:32:46 PM
|
| |

 |  |  NY 30
|  |  NYSDOT: bridge construction on NY 30 at CR 5; Wells until 5:30 PM, 12/03/10. Comment: Alternating one-way traffic controlled by temporary traffic signal.
Last update: 6/17/2010 3:27:57 PM
|
| |

 |  |  NY 342
|  |  NYSDOT: paving operations on NY 342 from I-81 - Exit 48 to START ROUTE NY 342; NY 12 due to paving operations for the next two weeks. starting 7:44 AM, 08/30/10 until 7:44 AM, 09/13/10.
Last update: 8/30/2010 7:44:44 AM
|
| |

 |  |  NY 345
|  |  NYSDOT: bridge maintenance operations on NY 345 from Potsdam Village Northwest Line to Town of Potsdam; Town of Madrid Line starting 8:00 AM, 09/01/10 until 5:00 PM, 09/10/10. Comment: There will be some work on the bridge approaches on the structure over Trout Brook.
Last update: 8/31/2010 10:51:55 AM
|
| |

 |  |  NY 37B
|  |  NYSDOT: closed to traffic on NY 37B northbound from Parker Avenue; NY 37B to Center Street. starting 5:15 PM, 06/03/10 until further notice. Comment: North bound lane from East Orvis to Center st. closed due to deck hole. until further notice,use alternate routes.
Last update: 6/3/2010 5:38:26 PM
|
| |

 |  |  NY 37B
|  |  NYSDOT: reduced to one lane on NY 37B in both directions from Parker Avenue; NY 37B to East Orvis Street. starting 1:01 PM, 12/28/09 until further notice.
Last update: 12/28/2009 1:05:29 PM
|
| |

 |  |  NY 37B
|  |  NYSDOT: construction work on NY 37B from START ROUTE; NY 37B to END ROUTE; NY 37 starting 7:00 AM, 04/12/10 until further notice. Comment: The contractors work may involve daily lane closures controlled with signs and flaggers.
Last update: 4/9/2010 1:26:48 PM
|
| |

 |  |  NY 37C
|  |  NYSDOT: reduced to one lane on NY 37C from START ROUTE NY 37C to Town of Massena; Town of Brasher Line due to bridge maintenance operations for the next two months. starting 8:53 AM, 08/31/10 until 8:53 AM, 10/30/10. Comment: Traffic will be reduced to one lane, controlled by temporary signals, to facilitate bridge painting operations on the structure over the Raquette River.
Last update: 8/31/2010 8:58:11 AM
|
| |

 |  |  NY 418
|  |  NYSDOT: bridge construction, single line traffic alternating directions on NY 418 in both directions at Water Street; CR 45; Elm Street; CR 9 starting 7:00 AM, 06/08/10 until further notice. Comment: Rte 418 is reduced to one lane alternating traffic at Milton St in Warrensburg. There is a temporary traffic signal controlling traffic for long term bridge work.
Last update: 6/7/2010 1:52:49 PM
|
| |

 |  |  NY 68
|  |  NYSDOT: paving operations on NY 68 from City of Ogdensburg; Town of Oswegatchie Line to Town of Lisbon; Town of Canton Line starting 5:30 AM, 08/11/10 until 6:00 PM, 09/03/10. Comment: Paving operation starts here on August 10th. Traffic will be controlled by flaggers and pilot trucks. Short delays expected during the paving operation.
Last update: 8/10/2010 9:10:06 AM
|
| |

 |  |  NY 8
|  |  NYSDOT: construction work on NY 8 from NY 365 to Town of Ohio; Town of Morehouse Line until 5:30 PM, 09/30/10. Comment: Alternating one-way traffic controlled by a temporary traffic signal due to culvert replacement.
Last update: 8/27/2010 1:42:22 PM
|
| |

 |  |  NY 8
|  |  NYSDOT: road construction, single line traffic alternating directions on NY 8 in both directions at Butlers Circle starting 7:00 AM, 05/20/10 until 5:00 PM, 09/30/10. Comment: Rte 8 in Brant Lake about 1/2 Mile east of Palisades Rd over the Spuytendivel will be alternating one way traffic until September with a temporary traffic signal for road work.
Last update: 5/14/2010 12:36:44 PM
|
| |

 |  |  NY 8
|  |  NYSDOT: bridge maintenance operations, single line traffic alternating directions on NY 8 in both directions at Town of Horicon; Town of Chester Line; Ramp. starting 7:00 AM, 04/20/10 until further notice. Comment: Rte 8 between Dixon Rd and Watering Tub Rd will have alternating one way traffic controlled by temporary traffic signals until further notice.
Last update: 4/20/2010 10:32:57 AM
|
| |

 |  |  NY 812
|  |  NYSDOT: reduced to one lane on NY 812 from Town of Oswegatchie; Village of Heuvelton to Village of Heuvelton; Town of Oswegatchie due to bridge construction. starting 10:06 AM, 05/26/09 until further notice. Comment: The bridge carrying Route 812 over the Oswegatchie River is being replaced. A Temporary detour structure is being used. Temporary traffic signals are in place and there is an 11' width restriction.
Last update: 10/13/2009 8:32:26 AM
|
| |

 |  |  NY 812
|  |  NYSDOT: construction work, reduced to one lane on NY 812 from Proctor Avenue; Ramp to Ogdensburg-Prescott Bridge; NY 812 until 2:00 PM, 11/28/10
Last update: 5/26/2010 8:17:08 AM
|
| |

 |  |  NY 812
|  |  NYSDOT: paving operations on NY 812 from CR 37 to Erie Canal Road starting 6:04 AM, 08/31/10 until 6:00 PM, 09/30/10 on weekdays. Comment: Pavement Milling to Begin on 8/31/10 south of Croghan Village and progress north to Bridge over the Beaver River.Paving Operations will begin after Labor Day. Expect minor delays, one way alternating traffic will be maintained with flaggers during work hours.
Last update: 8/30/2010 9:44:54 AM
|
| |

 |  |  NY 95
|  |  NYSDOT: bridge maintenance operations on NY 95 from START ROUTE NY 95; US 11; CR 5 to Town of Bombay; Town of Moira Line starting 8:00 AM, 09/01/10 until 5:00 PM, 09/10/10. Comment: There will be some work on the bridge approaches for the structure over Farrington Brook.
Last update: 8/31/2010 10:52:47 AM
|
| |

 |  |  NY 9N
|  |  NYSDOT: road construction on NY 9N from Clinton; Essex County Line to Town of Black Brook; Town of Ausable Line. starting 3:44 PM, 08/19/09 until further notice.
Last update: 8/19/2009 3:52:05 PM
|
| |

 |  |  US 11
|  |  NYSDOT: construction work on US 11 from NY 2U; Village of Rouses Point; Town of Champlain; US Customs Station to Canada Line; END ROUTE. starting 3:34 PM, 07/29/10 until further notice.
Last update: 7/29/2010 3:37:19 PM
|
| |

 |  |  US 9
|  |  NYSDOT: reduced to two lanes on US 9 in both directions from Town of Plattsburgh; City of Plattsburgh Line to Town of Plattsburgh; Town of Beekmantown Line; Plattsburgh Urban due to paving operations starting 7:00 AM, 08/25/10 until further notice on weekdays. Comment: Milling and resurfacing pavement.
Last update: 8/12/2010 3:02:12 PM
|
| |